Laserfiche WebLink
D. Complying with all federal, state, and local regulatory requirements, including the <br /> obtaining of all required permits. <br /> E. Fish and wildlife mitigation measures required by federal, state, or local laws and <br /> regulations. <br /> F. Actual construction as called for in the design documents and in change orders <br /> approved by the CWCB and the BORROWER. <br /> G. Engineering services for construction management, including design and construction <br /> management for CWCB-approved change orders. <br /> H. Interest during completion of the PROJECT pursuant to Paragraph A.4 of the Loan <br /> Contract. <br /> I. Legal services for reviewing engineering services contracts, reviewing this Contract, <br /> reviewing construction contract documents, and for complying with all federal, state, and <br /> local regulatory requirements. <br /> SECTION 10 — DISBURSEMENT SCHEDULE <br /> The BORROWER shall prepare a periodic progress report which contains a statement of <br /> the PROJECT costs expended for that period and shall forward said statement to the <br /> CWCB. After receipt of the periodic progress report from the BORROWER, and review <br /> and acceptance of the items therein as eligible expenses as described below, the <br /> CWCB will pay to the BORROWER the amount set forth in the report or such portion that <br /> has been approved by the CWCB. Such payment shall be made within thirty (30) days <br /> from the CWCB's approval of each progress report. <br /> SECTION 11 — TIME FOR PERFORMANCE <br /> PROJECT Beginning: Upon Effective Date of this Contract (the date this Contract is <br /> signed by the State Controller or his designee) <br /> PROJECT Finish: Two (2) years from the Effective Date of this Contract <br /> p 1.1) 4 <br /> .n <br /> Page 3 of 3 <br />