Laserfiche WebLink
• <br /> EXHIBIT A <br /> Legal Description, CWCB Portion of Water Pipeline <br /> from Tank to Distribution Point, Town of Rico, Colorado <br /> 1,557 linear feet 6" Class 150 mortar lined cast iron pipe, <br /> 2 each 6" gate valves <br /> 1 each 4" gate valves <br /> 1 each 3" gate valves <br /> 21. 5 linear feet manholes, together with all fittings and appurtenances <br /> located in place in the NWa of Section 36, T.40N. , R. 11W. , N.M.P.M. , <br /> Dolores County, Colorado, being more particularly described as follows: <br /> Beginning at a point in the NWi of Section 36, T.40N. , R. 11W. , N.M.P.M. , <br /> Dolores County, Colorado, from which point the U.S.L.M. #1 bears <br /> N. 07°58'38"E. a distance of 1,407. 88 ft. ; <br /> thence, N. 11°47'50"E. a distance of 598. 37 ft. ; <br /> ' thence, S.87°54'00"W. a distance of 553.00 ft. ; <br /> thence, S. 02°06'00"E. a distance of 130. 00 ft. ; <br /> thence, S. 87°54'00"W. a distance of 220. 00 ft. , from which point the <br /> U.S.L.M. #1 bears N.41°00'45"E. a distance of 1281.22 ft. <br /> EY r <br /> tit irAV ;41 <br />