My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2015-012 Amendment No. 01
CWCB
>
Loan Projects
>
DayForward
>
7001-8000
>
CT2015-012 Amendment No. 01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2018 1:19:56 PM
Creation date
9/26/2018 1:19:52 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-012
C150342
Contractor Name
Sanchez Ditch Reservoir Company
Contract Type
Grant/Loan Combo
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
APPENDIX A, AMENDMENT No. 1 TO LOAN CONTRACT C150342 <br /> AMENDMENT TO THE PROMISSORY NOTE <br /> Date: July2/ , 2014 <br /> Borrower: Sanchez Ditch and Reservoir Company, a Colorado nonprofit corporation <br /> Principal Amount: $1,381,276 <br /> Interest Rate: 2.0% per annum <br /> Term of Repayment: 40 years <br /> Loan Contract No.: C150342 <br /> Loan Payment: $50,493.58 <br /> Payment Initiation Date*: <br /> Maturity Date*: <br /> * Payment Initiation Date and Maturity Date fields are filled in after the project has been substantially <br /> completed. <br /> 1. FOR VALUE RECEIVED, the BORROWER promises to pay the Colorado Water Conservation Board <br /> ("CWCB"), the Principal Amount plus Interest for the Term of Repayment, pursuant to the LOAN <br /> CONTRACT and this PROMISSORY NOTE (NOTE). <br /> 2. This AMENDMENT No.1 TO PROMISSORY NOTE replaces and supersedes the PROMISSORY NOTE dated <br /> February 18, 2013, in the principal amount of$1,128,776. <br /> 3. Principal and interest shall be payable in equal Loan Payments, with the first payment due and <br /> payable one year from Payment Initiation Date, and annually thereafter. All principal, interest, and <br /> late charges, if any, then remaining unpaid shall be due and payable on or before the Maturity Date. <br /> 4. Payments shall be made to the Colorado Water Conservation Board at 1313 Sherman Street, <br /> Room 718, Denver, Colorado 80203. <br /> 5. The CWCB may impose a late charge in the amount of 5% of the annual payment if the CWCB <br /> does not receive the annual payment within 15 calendar days of the due date. <br /> 6. This NOTE may be prepaid in whole or in part at any time without premium or penalty. Any partial <br /> prepayment shall not postpone the due date of any subsequent payments or change the amount of <br /> such payments. <br /> 7. All payments received shall be applied first to late charges, if any, next to accrued interest and then <br /> to reduce the principal amount. <br /> Appendix A to Amendment No. 1 <br /> Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.