My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2019-2046 Contract
CWCB
>
Loan Projects
>
DayForward
>
7001-8000
>
CT2019-2046 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2018 11:17:07 AM
Creation date
9/26/2018 11:16:46 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2019-2046
Contractor Name
San Luis Valley Canal Company
Contract Type
Loan
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The Borrower shall initiate disbursement requests by invoice to CWCB, in a form and manner approved <br /> by CWCB. The following items are eligible for loan disbursements: <br /> A. Engineering associated with the feasibility report prepared as a requirement for this loan. <br /> B. Preparing final designs and specifications for the Project. <br /> C. Preparing bid and construction contract documents. <br /> D. Preparing environmental assessment or environmental impact statements, and otherwise <br /> complying with the Federal National Environmental Policy Act. <br /> E. Complying with all federal,state, and local regulatory requirements,including the obtaining of all <br /> required permits. <br /> F. Fish and wildlife mitigation measures required by federal, state,or local laws and regulations. <br /> G. Actual construction as called for in the design documents and in change orders approved by the <br /> CWCB and the Borrower. <br /> H. Engineering services for construction management, including design and construction <br /> management for CWCB approved change orders. <br /> I. Interest during completion of the Project pursuant to Section 10.,of the Contract. <br /> J. Legal services for reviewing engineering services contracts, reviewing this Contract, reviewing <br /> construction contract documents, and for complying with all federal, state, and local regulatory <br /> requirements. <br /> K. Project related expenses incurred prior to the Effective Date of this Contract in accordance with <br /> the approval of this loan. <br /> Section 10—Disbursement Schedule <br /> For project expenses: The Borrower shall prepare a periodic progress report that sets forth a <br /> statement of the Project costs expended for that period and shall forward said statement to the <br /> CWCB.After receipt of the periodic progress report from the Borrower,and review and acceptance <br /> of the items therein as eligible expenses,as described above,the CWCB will pay to the BORROWER <br /> the amount set forth in the report or such portion,as has been approved by the CWCB. Such <br /> payment shall be made within thirty(30)days from the CWCB's approval of each progress report. <br /> Section 11 —Time for Performance <br /> Project To Begin:Upon Effective Date of this Contract(the date this Contract is signed by the State <br /> Controller or his designee). <br /> Project To End: Three (3) years from the Effective Date of this Contract <br /> or upon the date stated within the CWCB Notice of Project Substantial Completion. <br /> Page 3 of 3 <br /> Contract Number:2019-2046 <br /> Appendix 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.