My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2019-2241 Contract
CWCB
>
Loan Projects
>
DayForward
>
7001-8000
>
CT2019-2241 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2018 4:00:57 PM
Creation date
9/5/2018 4:00:40 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2019-2241
Contractor Name
Missouri Heights Mountain Meadow Irrigation Company
Contract Type
Loan
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The Loan Effective Date is the date on which this Contract is approved and signed by the <br /> Colorado State Controller or Designee, as shown on the signature and cover page of this <br /> Contract. The State shall not have any obligation under this Contract prior to the Loan <br /> Effective Date. <br /> B. Loan Expiration Date <br /> The Loan Expiration Date is the date on which this Contract expires. The Loan Expiration <br /> Date is when the term of the loan ends; which is based upon the Loan Effective Date or the <br /> date of CWCB's Notice of Project Substantial Completion of Project. <br /> C. Project Term <br /> The Parties' respective performances of the project under this Contract shall commence on <br /> the Contract Project Performance Beginning Date shown on the Signature and Cover Page <br /> for this Contract and shall terminate on the Contract Project Performance End Date shown <br /> on the Signature and Cover Page for this Contract unless sooner terminated or further <br /> extended in accordance with the terms of this Contract. This project term does not include <br /> the full repayment period for the loan or this Contract. <br /> D. Project Extension Terms - State's Option <br /> The State,at its discretion, shall have the option to extend the Project performance under this <br /> Contract beyond the Project End Date for a period,at the same rates and under the same terms <br /> specified in the Contract(each such period a"Project Extension Term"). In order to exercise <br /> this option, the Borrower shall provide written justification to CWCB and CWCB will <br /> provide written authorization for the Project term extension. <br /> 3. AUTHORITY <br /> Authority to enter into this Contract exists in§37-60-119(2),C.R.S., §37-60-120, C.R.S.,and §37- <br /> 60-121, C.R.S. <br /> 4. PURPOSE <br /> At the July 18, 2018 board meeting, CWCB approved a loan request for a loan to be used for the <br /> Ditch Piping Phase B (Project). The purpose of the Project is to prevent water loss by piping a <br /> section of ditch that loses approximately twenty percent of its water due to seepage loss. Piping <br /> the ditch will eliminate water loss. The total estimated project cost is $774,000.00 and is located <br /> in Eagle County. <br /> 5. DEFINITIONS <br /> The following terms shall be construed and interpreted as follows: <br /> A. "Appendices" means the following appendices attached to this contract: <br /> i. Appendix 1, Project Summary <br /> ii. Appendix 2, Option Letter <br /> iii. Appendix 3, Promissory Note <br /> iv. Appendix 4, Resolution <br /> v. Appendix 5, Security Agreement <br /> vi. Appendix 6, Deed of Trust <br /> Page 3of19 <br /> Contract Number:CT2019-2241 <br />
The URL can be used to link to this page
Your browser does not support the video tag.