My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2019-2241 Contract
CWCB
>
Loan Projects
>
DayForward
>
7001-8000
>
CT2019-2241 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2018 4:00:57 PM
Creation date
9/5/2018 4:00:40 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2019-2241
Contractor Name
Missouri Heights Mountain Meadow Irrigation Company
Contract Type
Loan
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
APPENDIX 1, PROJECT SUMMARY <br /> Loan Contract Number CT2019-2241 <br /> Section 1 —Borrower's Name <br /> Missouri Heights Mountain Meadow Irrigation Company <br /> Section 2—Project Description <br /> A. Description of Project: The Borrower applied to the CWCB for a loan to be used for the Ditch <br /> Piping Phase B (Project). The purpose of the Project is to prevent water loss by piping a section <br /> of ditch that loses approximately twenty percent of its water due to seepage loss.Piping the ditch <br /> will eliminate water loss. The total estimated Project Cost is$774,000.00 and is located in Eagle <br /> County. <br /> B. Description of Feasibility Study: Dennis Davidson, P.E., an independent engineering consultant, <br /> prepared the Loan Feasibility Study titled, "Feasibility Study of Irrigation Pipeline for the <br /> Missouri Heights — Mountain Meadow Irrigation Company Phase B-1 and Phase B-2," dated <br /> March, 2018. The feasibility study was prepared in accordance with CWCB guidelines. Mike <br /> Kishimoto and John Andrews, P.E., with NRCS provided preliminary engineering design and <br /> construction cost estimates. Financial statements were provided by Gay Lewis, Treasurer of the <br /> Company. Based upon the feasibility report,the CWCB determined the Project to be technically <br /> and financially feasible. <br /> Section 3—CWCB's Authority <br /> This loan is made pursuant to the provisions of §§37-60-119 and 37-60-120, C.R.S., which <br /> authorizes the CWCB to loan money for water projects from the CWCB Construction Fund for the <br /> benefit of the people of the state,provided that the Borrower assures repayment of that money. <br /> Section 37-60-122(1)(b) C.R.S.,authorizes the CWCB to make loans of up to $10,000,000 from <br /> the CWCB's Construction Fund without prior approval from the General Assembly. <br /> Section 4-Board Approval <br /> At its July 18, 2018 meeting the CWCB approved a Project Loan from the CWCB Construction <br /> Fund to the Borrower. This loan contract is for $300,000.00 for Project Costs. CWCB's Loan <br /> Origination Fee of 1%in the amount of$3,000.00 in accordance with CWCB Policy No. 16,added <br /> to the Base Loan Amount results in a Total Loan Amount of$303,000.00 at an interest rate of <br /> 2.05%per annum for a repayment term of thirty(30)years. <br /> Section 5—Schedule of Existing Debt As of the date of the CWCB loan approval, the Borrower has one <br /> (1)existing loan with CWCB,that is in good standing. <br /> Lender Original Current Annual Maturity Collateral <br /> Balance Balance Payment Date <br /> CV/CB (C150351) $428,548 $22,582 $3,604 2025 Assessment revenues, ditch lining <br /> project <br /> Page 1 of 3 <br /> Contract Number:2019-2241 <br /> Appendix 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.