Laserfiche WebLink
Rio Grande Reservoir Project <br /> Phase 2A <br /> Item No Description Quanitity Unit Cost Extension <br /> Site Work <br /> 1000 General Mobilization 1 LS $ 483,000 $ 483,000 <br /> 1010 Underground Mobilization 1 LS $ 113,000 $ 113,000 <br /> • <br /> 1200 Repair of Cofferdam&Slide Gate 1 LS _ $ 50,000 $ 50,000 <br /> - <br /> 1300 Water Handling&Care of River 1 LS $ 35,000 $ 35,000 <br /> Subtotal $ 681,000 <br /> Intake Structure <br /> 2000 Demo Existing Inlet Structure 1 LS $ 115,000 $ 115,000 <br /> 2050 Foundation Prep for Intake Structure _ 1 LS $ 89,000 $ 89,000 <br /> 2100 Intake Site Access Ramp&Pad 1 LS $ 50,000 $ 50,000 <br /> Subtotal $ 254,000 <br /> Concrete <br /> 2300 Intake Structure Concrete 232 CY $ 3,850.00 $ 893,200 <br /> Metal <br /> 2400 F&I Trash Rack 21,000 LB $ 9.00 $ 189,000 <br /> 2500 F&I Stop Logs/Guard Gates 31,000 LB $ 7.25 $ 224,750 <br /> 2600 F&I Gathers&Deflectors 6,000 LB $ 11.50 $ 69,000 <br /> 2650 Dog-Off and Springs _ 1,200 LB $ 5.00 $ 6,000 <br /> 2700 12"Dia.Butterfly Valve Incl Stem&Hardware 2 EA $ 950.00 $ 1,900 <br /> 2750 8"Dia.Restrained Ductile Iron Vent Pipe 600 LF $ 110.00 $ 66,000 <br /> 2800 Extend Staff Gage 50 FT $ 260.00 $ 13,000 <br /> Subtotal $ 569,650 <br /> Outlet Tunnel <br /> 3000 Class I Spot Bolts 40 EA $ 360.00 $ 14,400 <br /> 3100#8 Rockbolts 8'Length incl rocktrap 168 EA $ 350.00 $ 58,800 <br /> 3200 Tunnel Shotcrete 2"average 76 NCY $ 2,810.00 $ 213,560 <br /> 3300 Rock Trap Excavation 190 NCY $ 675.00 $ 128,250 <br /> 3400 Concrete Invert incl Rock Trap 237 _ NCY $ 1,070.00 $ 253,590 <br /> 4000 Grout Curtain Primary Air Rotary Drilling 500_ LF $ 40.00 $ 20,000 <br /> 4100 Primary Hookups 24 EA $ 2,530.00 $ 60,720 <br /> 4200 Primary Sacks of Cement 500_ SK $ 16.00 $ 8,000 <br /> 5000 12'long Spiling for Bypass Tunnel-both Portals 24 EA $ 585.00 $ 14,040 <br /> Subtotal $ 771,360 <br /> Miscellaneous <br /> 6000 QC Testing 1 LS $ 65,000 $ 65,000 <br /> 6100 Office Trailers 1 LS $ 102,000 $ 102,000 <br /> 6200 Surveying 1 LS $ 52,000 $ 52,000 <br /> 7000 Demob 1 LS $ 76,000 $ 76,000 <br /> Subtotal $ 295,000 <br /> TOTAL BID $ 3,464,210 <br />