APPENDIX 1, PROJECT SUMMARY <br /> Loan Contract Number CT2018-3303 <br /> Section 1 —Borrower's Name <br /> San Luis Valley Irrigation District <br /> Section 2—Project Description <br /> A. Description of Project: The Borrower applied to the CWCB for a loan to be used for the Rio <br /> Grande Reservoir Rehabilitation-Phase 2 (Project), located in Hinsdale County, at a total <br /> estimated project cost of$25,000,000.00. The purpose of the Project is to provide operational <br /> efficiencies and improve stream health and utilization of Rio Grande water by rehabilitating the <br /> outlet works of the on-channel Rio Grande Reservoir Dam. <br /> B. Description of Feasibility Study: DiNatale Water Consultants prepared the Loan Feasibility Study <br /> titled, "Feasibility of Rehabilitation of Rio Grande Reservoir Hinsdale County, CO," dated <br /> February 2018. The feasibility study was prepared in accordance with CWCB guidelines and <br /> includes engineering design, and construction cost estimates prepared by Deere & Ault <br /> Consultants,Inc. Financial statements were prepared by Wall,Smith,Bateman,Inc.Alamosa. The <br /> Feasibility Study is incorporated herein by this reference. Based upon the feasibility report, the <br /> CWCB determined the Project to be technically and financially feasible. <br /> Section 3—Authority <br /> The Rio Grande Reservoir Rehabilitation Project is a component of the Rio Grande Cooperative <br /> Project(Cooperative Project)which received a funding authorization from the General Assembly <br /> in the 2012 Projects Bill(SB 12S-002).Due to increased construction cost estimates during the final <br /> design of the Project,the authorization was increased in the 2017 Projects Bill (HB17-1248). The <br /> legislation provided a $5 million grant for Phase 1 of the Rio Grande Reservoir Rehabilitation <br /> Project.Phase 1 funding was used to addressed dam seepage,a land exchange with the U.S. Forest <br /> Service,and final design. The remaining authorization of$25 million is available for Phase 2. <br /> Section 4-Board Approval <br /> At its March, 2018,meeting the CWCB approved a Project Loan from the Construction Fund,to <br /> the Borrower, in a total loan amount of$15,000,000.00 at an interest rate of 1.65 % per annum <br /> for a repayment term of 30 years. <br /> This loan is made pursuant to the provisions of §§37-60-119 and 37-60-120, C.R.S., which <br /> authorizes the CWCB to loan money for water projects from the CWCB Construction Fund for <br /> the benefit of the people of the state,provided that the Borrower assures repayment of that money. <br /> Section 5—Schedule of Existing Debt <br /> As of the date of the CWCB loan approval,the Borrower has three CWCB loans. All three loans <br /> were for improvements to the Reservoir and are in good standing. <br /> Page 1 of 3 <br /> Contract Number:CT2018-3303 <br />