My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2015-151 Final Report
CWCB
>
Loan Projects
>
DayForward
>
7001-8000
>
CT2015-151 Final Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2018 11:23:32 AM
Creation date
5/14/2018 11:22:46 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-151
Contractor Name
Louden Irrigation Canal
Contract Type
Loan
Loan Projects - Doc Type
Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
should flow smoothly over the diversion and remain smoothly flowing for <br /> about 20 ft downstream. <br /> • Although care was taken to keep the original ditch bottom intact, excavating <br /> sediment, installing the concrete blocks, and realigning a portion of the Ditch <br /> creates the potential for leaks and seeps to form. The toe along the repaired <br /> section of the Ditch should be walked periodically to check for any signs of <br /> erosion or wet spots anywhere at the toe or on the embankments. Familiarity <br /> with the existing conditions will ensure a change is noticed, should a problem <br /> develop. <br /> • <br /> Louden Irrigating Canal and Reservoir Company 7 Telesto Solutions,Inc. <br /> rIlouden_trienirouden_d,Ychiyroducte12013Jtnode gmeering,�relieriiiaio1a_find_kner12o14oiio_mua n_as_ronsiMcreaflood _,mala January 2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.