My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2018-3122 Contract
CWCB
>
Loan Projects
>
DayForward
>
7001-8000
>
CT2018-3122 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2018 8:45:30 AM
Creation date
5/11/2018 8:45:14 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2018-3122
Contractor Name
Trinchera Irrigation Company
Contract Type
Grant/Loan Combo
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
STATE OF COLORADO LOAN CONTRACT <br /> SIGNATURE AND COVER PAGE <br /> THREE(3)SIGNATURE PAGES(COVER PAGE),WITH ORIGINAL SIGNATURES,ARE REQUIRED <br /> State Agency Contract Numbers <br /> Department of Natural Resources CMS 108596 <br /> Colorado Water Conservation Board(CWCB) CT2018-3122 <br /> 1313 Sherman St,Room 718,Denver,CO 80203 <br /> Borrower and Address Loan Contract Project Performance Beginning Date: <br /> Trinchera Irrigation Company The later of 05/01/2018 or the date the State Controller or an <br /> 610 Main Street authorized delegate signs this Loan Contract. <br /> Blanca,CO 81123 Loan Contract Project Performance End Date: <br /> Entity Type Three(3)years from Effective Date or upon the date of CWCB's <br /> Nongovernmental Notice of Project Substantial Completion of the Project. <br /> Base Loan Amount Loan Contract Terms <br /> $436,000.00 1.65%for 30 years <br /> Loan 1%Origination Fee Project Name <br /> $4,360.00 Mountain Home Dam Outlet Rehabilitation Phase III <br /> Total Loan Amount Loan Contract Purpose <br /> $440,360.00 To meet State Engineers Office,Dam Safety Branch's(SEO) <br /> emergency drawdown requirements and eliminate leakage by <br /> rehabilitating dam outlet works. <br /> THE PARTIES HERETO HAVE EXECUTED THIS CONTRACT <br /> Each person signing this Contract represents and warrants that he or she is duly authorized to execute this Contract and to bind the Party <br /> authorizing his or her signature. <br /> BORROWER STATE OF COLORADO <br /> Trinchera Irrigation Company John W.Hickenlooper,Governor <br /> Colorado Department of Natural Resources <br /> p T/ Colorado Water Conservation Board(CWCB) <br /> (Signature) <br /> 1 �I_t/1 i n <br /> _ r r�,(� X Vu/�, <br /> _.....---. (Sig, <br /> Name: j y'e4/rL S �'S 1If r )Laterts, <br /> t i :•_L. 1tCe. <br /> Title: -Are 51[Y p/1 I <br /> �/ Date: i-%//7//g <br /> T <br /> Date: `9- fil U <br /> LEGAL REVIEW <br /> ATTEST:���//1 c2�� Cynthia H.Coffman,Attorney General <br /> (Signature) N/A <br /> Name: , e7.,-- Z_6 �,,,,�f�� By:Assistant Attorney General <br /> Title: T?4,5 mi C - Date: <br /> Date: Lt/q/oie <br /> In accordance with§24-30-202 C.R.S.,this Contract is not valid until signed and dated below by the S • .. oiler or an authorized delegate. <br /> STATE CONTROLLER <br /> Robert Jaros,CPA,MBA, <br /> By / // <br /> Maggie Van - - <br /> Purchasing Director <br /> ?4/2aisp- <br /> Effec i Date: <br /> Page 1 of 19 <br /> Contract Number:CT2018-3122 <br />
The URL can be used to link to this page
Your browser does not support the video tag.