My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
17-Oct-St. Charles Mesa Water District- Long-Term Potable Water Supply to the Zinno Subdivision_CMS Record
CWCB
>
Water Plan Grants
>
Supply and Demand Gap Grant Fund
>
17-Oct-St. Charles Mesa Water District- Long-Term Potable Water Supply to the Zinno Subdivision_CMS Record
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2018 12:50:59 PM
Creation date
4/24/2018 8:09:45 AM
Metadata
Fields
Template:
Water Plan Grants
Basin
Arkansas
Applicant
St. Charles Mesa Water District
Project Description
Long-Term Potable Water Supply to the Zinno Subdivision
Project Categories
Supply & Demand Gap
Date
1/23/2018
Contract/PO #
CTGG1 2018-1918
Water Plan Grants - Doc Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
If selected OTHER,enter the <br /> justification for the Source.: <br /> Select ALL steps taken in making the <br /> Sole Source determination.: <br /> Is this a Statutory Violation?: <br /> Is this a High Risk or Low Risk Low Risk <br /> Contract?: <br /> Are Services ANTICIPATED to occur <br /> outside of Colorado?(*): <br /> Are Services ANTICIPATED to occur <br /> outside of the United States?(*): <br /> Is the Contractor/Vendor performing <br /> work previously performed by State <br /> Employee(s)?: <br /> How many positions(FTE)is the <br /> Contractor/Vendor filling that were <br /> previously performed by State <br /> Employees?: <br /> For work previously performed by <br /> State Employees,how long did the <br /> Contractor perform the work?(#of <br /> months): <br /> How many positions were <br /> ELIMINATED by the <br /> Contractor/Vendor performing this <br /> Work?: <br /> Number of State Jobs Created(*§): <br /> Duration of State Jobs Created(*): <br /> What Quality Improvements did the <br /> State gain by having <br /> Contractor/Vendor do the Work <br /> previously performed by State <br /> Employees?: <br /> What Dollar($)Savings did the State <br /> gain by having Contractor/Vendor do <br /> the Work previously performed by <br /> State Employees?: <br /> Percentage of work ACTUALLY <br /> performed outside of Colorado.(*§): <br /> Percentage of work ACTUALLY <br /> performed outside of the United <br /> States.(*§): <br /> Program Manager: Mauss,Anna <br /> Has this contract been Certified as <br /> including:Performance Measures and <br /> Standards,Methods for Resolution, <br /> and Types of Monitoring Processes?: <br /> If this contract has been <br /> renewed/extended,has the <br /> contractor's previous work been <br /> certified as complying with the terms <br /> of the contract?: <br /> If applicable,enter date of MOST <br /> RECENT annual certification of <br /> contractor work.: <br /> Final Contractor/Vendor Rating(no <br /> renewal periods remain) (*§): <br /> When was the Rating sent to the <br /> Contractor/Vendor?: <br /> Did the Contractor/Vendor submit <br />
The URL can be used to link to this page
Your browser does not support the video tag.