My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
17-Oct-St. Charles Mesa Water District- Long-Term Potable Water Supply to the Zinno Subdivision_CTGG1 2018-1918
CWCB
>
Water Plan Grants
>
Supply and Demand Gap Grant Fund
>
17-Oct-St. Charles Mesa Water District- Long-Term Potable Water Supply to the Zinno Subdivision_CTGG1 2018-1918
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2018 9:36:51 AM
Creation date
4/24/2018 8:09:42 AM
Metadata
Fields
Template:
Water Plan Grants
Basin
Arkansas
Applicant
St. Charles Mesa Water District
Project Description
17-Oct-St. Charles Mesa Water District- Long-Term Potable Water Supply to the Zinno Subdivision
Project Categories
Supply & Demand Gap
Date
1/23/2018
Contract/PO #
CTGG1 2018-1918
Water Plan Grants - Doc Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DjNR COLORADO <br /> CO :If CdW <br /> Conseroloravoationater Board <br /> Department of Natural Resources <br /> Tasks <br /> F. Contractor will demolish and remove storage tanks and cap wells. <br /> G. A new TR-840 filter which will be installed at the water treatment plant <br /> Deliverable: <br /> SCMWD will deliver to CWCB a final report documenting the construction of the new water supply <br /> system. <br /> Tasks <br /> Task 3—Project and Grant Management(Task 3 will not be paid for by WPG funding.) <br /> Description of Task: <br /> SCMWD requires assistance to handle the management of documents for the construction project. <br /> SCMWCD also requires an expert in grant management to be able to organize&secure documentation <br /> for reimbursement from several different funding sources. <br /> Method/Procedure: <br /> A. The project/grant manager will manage all pertinent pre-construction documents for the <br /> project(i.e.:to CDPHE approval,Geotech testing, survey results, pertinent construction plans <br /> and contract documents).The project/grant manager will manage all pertinent construction <br /> documents(i.e.:Surveying and traffic control, installation of the proposed potable water <br /> system, installation of proposed individual user taps and water meters, and the purchase of a <br /> TR-840 filter). <br /> B. The project/grant manager will be responsible to organize,develop and monitor all grant/loan <br /> reimbursements for the project. <br /> Deliverable: <br /> Project/grant manager will deliver all pertinent documents related to the tasks the Water Plan grant <br /> supports. <br /> Water Plan Grant Exhibit A - Statement of Work Page 4 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.