Laserfiche WebLink
APPENDIX 1, PROJECT SUMMARY <br /> Loan Contract Number CT2018-2851 <br /> Section 1—Borrower's Name <br /> Central Colorado Water Conservancy District,Well Augmentation Subdistrict <br /> Section 2—Project Description <br /> A. Description of Project: The Borrower applied to the CWCB for a loan to be used for the Shores <br /> Lakes Pond C Infrastructure Improvement(Project),located in Weld County,at a total estimated <br /> project cost of$3,430,000.00. The purpose of the Project is to increase the efficiency by which <br /> the Shores Lakes can capture and release water for augmentation use. <br /> B. Description of Feasibility Study: Ed Armbruster, P.E., with White Sands Water Engineers, Inc., <br /> prepared the Loan Feasibility Study titled, "CWCB Loan Feasibility Study, Shores Lakes <br /> Infrastructure Improvement Project,"dated September 15,2017.The feasibility study was prepared <br /> in accordance with CWCB guidelines and includes an alternative analysis and construction costs <br /> estimates. Audited financial statements of WAS were provided by Anton Collins Mitchell, LLP. <br /> Based upon the feasibility report, the CWCB determined the Project to be technically and <br /> financially feasible. <br /> Section 3—CWCB's Authority <br /> Construction Fund:This loan is made pursuant to the provisions of§§37-60-119 and 37-60-120, <br /> C.R.S., which authorizes the CWCB to loan money for water projects from the CWCB <br /> Construction Fund for the benefit of the people of the state, provided that the Borrower assures <br /> repayment of that money. <br /> Section 37-60-122(1)(b) C.R.S.,authorizes the CWCB to make loans of up to $10,000,000 from <br /> the CWCB's Construction Fund without prior approval from the General Assembly. <br /> Section 4-Board Approval <br /> At its January 22,2018 meeting the CWCB approved a Project Loan from the Construction Fund, <br /> to the Borrower, in an amount up to$2,344,000.00 for Project Costs. CWCB's Origination Fee of <br /> 1%in the amount of$23,440.00,in accordance with CWCB Policy No. 16,added to the Base Loan <br /> Amount results in a Total Loan Amount of$2,367,440.00, at an interest rate of 1.65%per annum <br /> for a repayment term of 30 years. <br /> Section 5—Schedule of Existing Debt <br /> As of the date of the CWCB loan approval,the Borrower's existing debt consists of the following CWCB <br /> loans. Both loans are in good standing. <br /> Loan No. Original Bal Current Bal Annual Payment Maturity Date Collateral <br /> C150194 $14,934,612 $12,367,163 $713,541 2040 Pledge of taxrevenues <br /> CT2015-060 $1,651,905 $1,651,905 $71,246 2047 Pledge of tax revenues <br /> Page 1 of 3 <br /> Contract Number:CT2018-2851 <br />