Laserfiche WebLink
and filing. <br /> K. Upon completion of the PROJECT construction, the BORROWER shall arrange a final <br /> inspection for the CWCB staff. <br /> L. The BORROWER shall pay all of the expenses related to the PROJECT when such bills are <br /> due. <br /> SECTION 7 - ELIGIBLE EXPENSES. The following items are eligible for loan disbursements. <br /> A. Preparing final designs and specifications for the PROJECT. <br /> B. Preparing bid and construction contract documents. <br /> C. Preparing environmental assessment or environmental impact statements, and otherwise complying <br /> with the Federal National Environmental Policy Act. <br /> D. Complying with all federal, state, and local regulatory requirements, including the obtaining of all <br /> required permits. <br /> E. Fish and wildlife mitigation measures required by federal, state, or local laws and regulations. <br /> F. Actual construction as called for in the design documents and in change orders approved by the <br /> CWCB and the BORROWER. <br /> G. Engineering services for construction management, including design and construction management <br /> for CWCB-approved change orders. <br /> H. Interest during completion of the PROJECT pursuant to Paragraph A.2 herein. <br /> I. Legal services for reviewing engineering services contracts, reviewing this contract, reviewing <br /> construction contract documents, and for complying with all federal, state, and local regulatory <br /> requirements. <br /> SECTION 8 — DISBURSEMENT SCHEDULE <br /> The BORROWER shall prepare a periodic progress report which contains a statement of the PROJECT <br /> costs expended for that period and shall forward said statement to the CWCB. After receipt of the <br /> periodic progress report from the BORROWER, and review and acceptance of the items therein as <br /> eligible expenses as described below, the CWCB will pay to the BORROWER the amount set forth in the <br /> report or such portion that has been approved by the CWCB. Such payment shall be made within <br /> thirty (30) days from the CWCB's approval of each progress report. <br /> SECTION 9— TIME FOR PERFORMANCE <br /> Project Beginning: Upon the Effective Date of this contract <br /> Project Finish: 3 years from the Effective Date of this contract <br /> SECTION 10 — Additional Contract Requirements <br /> As a condition of the CWCB's loan approval, each of the BORROWER'S partners and their spouses <br /> shall co-sign the loan contract and the promissory note. . <br />