Laserfiche WebLink
SCHEDULE A <br /> COLORADO WATER CONSERVATION BOARD <br /> CONSTRUCTION FUND PROGRAM PROCEDURES <br /> 1. Board approval of engineering firm and engineering agreement <br /> between engineering firm and project sponsO1 . <br /> 2. Preparation of detailed plans and specifications for <br /> authorized projects by consulting engineering firm. <br /> 3 . Approval of detailed plans and specifications by Board staff <br /> (plans and specifications for storage dams and reservoirs <br /> must also be approved by State Engineer's Office) . <br /> 4 . Board staff approval of bidding for the project. Board <br /> staff present at bid opening for construction. <br /> 5. Project sponsor may issue the notice of award and the notice <br /> to proceed with construction to the contractor (both notices <br /> must be approved by the Board staff before they are issued) . <br /> 6. Conduct a pre-construction conference. Approval of <br /> construction schedule by Board staff. <br /> 7. Construction commences. The Board staff makes periodic <br /> inspections during construction. All change orders must be <br /> approved by the Board staff in advance and before any <br /> construction on change items can commence. Emergency items <br /> cleared by telephone. <br /> 8. The consulting engineer certifies that the project has been <br /> completed according to approved drawings and specifications <br /> and arranges for final inspection. <br /> 9. Final inspection and acceptance of as-built project by Board <br /> staff. <br /> 10. Submittal of as-built drawings to Board staff for approval <br /> and filing. <br /> EXHIBIT F <br />