Laserfiche WebLink
hundred percent (100%) interest in diversion structure located on the South Platte River <br /> at approximately 100th Avenue, as more particularly described in the attached Deed of <br /> Trust ("Collateral"). <br /> SECTION 7 — ADDITIONAL CONDITIONS & CONTRACT REQUIREMENTS <br /> The CWCB acknowledges that, pursuant to its approval of the loan wherein loan <br /> proceeds may be used to repay PROJECT costs already incurred, (1) the BORROWER <br /> has completed all or part of the PROJECT, and (2) all phases of the PROJECT has been <br /> completed in accordance with CWCB Construction Fund Program Procedures, as <br /> listed in Section 8 below. <br /> SECTION 8 — CONSTRUCTION FUND PROGRAM PROCEDURES <br /> A. The BORROWER shall employ an engineer, registered in the state of Colorado to <br /> prepare plans and specifications for the PROJECT. <br /> B. The BORROWER'S and the Engineering Consultant's Agreements and the plans and <br /> specifications must be submitted to the CWCB staff for verification of compliance <br /> with the terms of this Contract when available prior to bidding. Any modifications to <br /> the plans and specifications must be approved in writing by the CWCB staff. <br /> C. For plans and specifications for all jurisdictional dams and reservoirs, as defined by <br /> § 37-87-105 C.R.S., the BORROWER shall provide a letter of approval from the State <br /> Engineer's Office prior to construction. <br /> D. CWCB staff must be present at bid opening and must approve the award of the <br /> construction contract. <br /> E. The BORROWER shall contract for the construction of the work with responsible and <br /> capable Construction Firms, which said Construction Firms shall be selected by the <br /> BORROWER and found acceptable by the CWCB staff. <br /> F. The BORROWER must provide a copy of the executed construction contract <br /> documents consisting of the contractor's proposal, construction contract, <br /> performance bond, payment bond, notice of award, notice to proceed, sample <br /> change order, and sample field order, as well as the a i t r id and bid <br /> bond at bidding. After the CWCB staff verifies that th ' imply with <br /> the terms of this contract, the BORROWER may issue r • •ceed to the <br /> Construction Firms. 7-01 <br /> G. The BORROWER shall conduct a pre-constructioNa-rer h h e. the <br /> t � 4i <br /> CWCB staff shall have the opportunity to review ands ap'ove4le� st'rttCtion <br /> schedule. <br /> H. If the CWCB staff determines that the PROJECT requires a resident inspector during <br /> construction, the BORROWER shall employ an inspector who has been approved by <br /> the CWCB staff. <br /> I. The BORROWER shall construct the PROJECT in accordance with the approved plans <br /> and specifications. <br /> J. Upon completion of the PROJECT construction, the BORROWER shall provide as-built <br /> drawings of the PROJECT to the CWCB staff, or, if required by § 37-87-105, C.R.S., <br /> the BORROWER shall provide the as-built drawings to the State Engineer's Office for <br /> Page 2 of 3 <br />