Laserfiche WebLink
. i <br /> CONCLUSIONS 28 <br /> LIST OF TABLES <br /> Table 1 - Current Non-Potable Water Demand 6 <br /> Table 2 — Future Town Park Water Demands 7 <br /> Table 3 - Summary of Non-Potable Water Rights Owned by the Town of Windsor 9 <br /> Table 4 - New Cache la Poudre Irrigating Company Information 14 <br /> Table 5 - Cache la Poudre Reservoir Company Information 15 <br /> Table 6 —Approximate New Cache and CLP Reservoir Delivery and Consumptive Use <br /> 17 <br /> Table 7 - Lake Canal Direct Flow Rights 17 <br /> Table 8 - Lake Canal Storage Rights 18 <br /> Table 9 - Whitney Ditch Information 19 <br /> Table 10 - B.H. Eaton Ditch Information 20 <br /> Table 11 - Box Elder Ditch 21 <br /> Table 12 — Implementation Schedule 22 <br /> Table 13 - Final Cost Estimate Summary 23 <br /> Table 14 - Infrastructure Cost Estimate — Greeley No. 2 Canal Delivery 24 <br /> Table 15 - Infrastructure Cost Estimate — Cache la Poudre River Diversion 25 <br /> Table 16 - Infrastructure Cost Estimate (Combined Alternatives No 1 & 2) - Greeley No. <br /> 2 Canal Delivery & Cache la Poudre Diversion 26 <br /> Table 17 - Financial Summary 27 <br /> LIST OF FIGURES <br /> Figure 1 —Windsor Vicinity Map <br /> Figure 2 —Windsor Park Sites <br /> Figure 3 — Storage Options <br />