My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2015-057 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
7001-8000
>
CT2015-057 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2018 9:40:18 AM
Creation date
3/28/2018 9:40:15 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-057
C150366
Contractor Name
Town of Windsor
Contract Type
Loan
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SELECTED WATER RIGHTS ALTERNATIVE AM 0-1) R3 <br /> The selected water rights are shares of New Cache direct flow rights and shares of Box <br /> Elder Ditch Company. Out of the ditch water rights considered, these two water rights <br /> run in close proximity to Kyger Reservoir and the infrastructure can be installed to <br /> deliver both water sources directly into the reservoir. <br /> The Town of Windsor has been actively looking for both of these water rights, but <br /> currently does not have either water right under contract. <br /> A- <br /> IMPLEMENTATION SCHEDULE Iy, <br /> Table 12—Implementation Schedule <br /> Task Date <br /> Submit Feasibility Study to CWCB August2013 <br /> Purchase Kyger Reservoir Infrastructure December 2013 <br /> Begin Design of Kyger Reservoir Infrastructure January2014 <br /> Complete Design of Kyger Reservoir Infrastructure June 2014 <br /> Start Construction of Kyger Reservoir Infrastructure August 2014 <br /> Complete Construction January2015 <br /> 1N,qaE - 26oM'L'.1 ?u taAse <br /> INSTITUTIONAL CONSIDERATIONS <br /> Entities that are, or may be, involved in the design, permitting, construction, and <br /> financing of the project include: <br /> 1. Town of Windsor; financing and project management. <br /> 2. River Bluffs Ventures, LLC; design and construction of Kyger Reservoir. <br /> 3. Leonard Rice Engineers, Inc.; design and construction oversight of reservoir <br /> water delivery and outlet infrastructure. <br /> 4. Clear Water Solutions; water rights purchasing, permitting <br /> 5 Lawrence Jones Custer Grasmick LLP; water rights purchasing, permitting, and legal <br /> support. <br /> The Town of Windsor will be the lead for the financing, design, and construction of the <br /> project and will be the entity entering into contracts and agreements with the various <br /> entities for the services provided by each. <br />
The URL can be used to link to this page
Your browser does not support the video tag.