My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2018-2832 Contract
CWCB
>
Loan Projects
>
DayForward
>
7001-8000
>
CT2018-2832 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2018 1:38:07 PM
Creation date
3/7/2018 1:37:52 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2018-2832
Contractor Name
Bessemer Irrigating Ditch Company
Contract Type
Loan
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
APPENDIX 1, PROJECT SUMMARY <br /> Loan Contract Number CT2018-2832 <br /> Section 1 Borrower's Name <br /> Bessemer Irrigating Ditch Company <br /> Section 2—Project Description <br /> A. Description of Project:The Borrower applied to the CWCB for a loan to be used for the Landslide <br /> Stabilization and Ditch Lining (Project), located in Pueblo County, at a total estimated project <br /> cost of$900,000.00 The purpose of the Project is to stabilize the ditch and maintenance road and <br /> to line the ditch throughout the stabilized area. <br /> B. Description of Feasibility Study: Rick Kidd, P.E., with Kidd Engineering, prepared the Loan <br /> Feasibility Study titled, "Emergency Landslide Stabilization Project Loan Feasibility Study," <br /> dated November 30, 2017. The feasibility study was prepared in accordance with CWCB <br /> guidelines and includes an analysis of alternatives, preliminary engineering design, and <br /> construction cost estimates and is incorporated herein by this reference. Audited financial <br /> statements were provided by the Company and prepared by McPherson,Breyfogle,Daveline and <br /> Goodrich, PC, Certified Public Accountants. Based upon the feasibility report, the CWCB <br /> determined the Project to be technically and financially feasible. <br /> Section 3—CWCB's Authority <br /> Construction Fund:This loan is made pursuant to the provisions of§§37-60-119 and 37-60-120, <br /> C.R.S., which authorizes the CWCB to loan money for water projects from the CWCB <br /> Construction Fund for the benefit of the people of the state, provided that the Borrower assures <br /> repayment of that money. <br /> Section 37-60-122(1)(b)C.R.S., authorizes the CWCB to make loans of up to $10,000,000 from <br /> the CWCB's without prior approval from the General Assembly. <br /> Section 4-Board Approval <br /> At its Jaunary 22,2018,meeting the CWCB approved a Project Loan from the Construction Fund, <br /> to the Borrower, in an amount up to $900,000.00 for Project Costs. CWCB's Origination Fee of <br /> 1%in the amount of$9,000.00 in accordance with CWCB Policy No. 16,added to the Base Loan <br /> Amount results in a Total Loan Amount of$909,000.00,at an interest rate of 1.65%per annum for <br /> a repayment term of(twenty(20)years. <br /> Section 5—Schedule of Existing Debt <br /> As of the date of the CWCB loan approval, no other debt,backed by the loan security described in <br /> Section 6 below,exists <br /> Section 6—Loan Security <br /> The Security for this loan,as evidenced by the executed Security Agreement(Appendix 5) and <br /> incorporated herein, shall be: (i)an irrevocable(but not exclusive)pledge to the CWCB of the <br /> Pledged Revenues in such amount as is necessary to make each annual payment due under this <br /> Contract, (ii) an assessment covenant; and(iii)an undivided one hundred percent(100%) <br /> interest in a section of the Bessemer Ditch,as more particularly described in the attached Deed <br /> of Trust(Appendix 6).All Loan Security shall be in accordance with CWCB Policy No. 5. <br /> Page 1 of 3 <br /> Contract Number.CT2018-2832 <br />
The URL can be used to link to this page
Your browser does not support the video tag.