My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2018-2829 Contract
CWCB
>
Loan Projects
>
DayForward
>
7001-8000
>
CT2018-2829 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2018 1:22:21 PM
Creation date
2/28/2018 1:22:08 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2018-2829
Contractor Name
Lupton Bottom Ditch Company
Contract Type
Loan
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
APPENDIX 2, OPTION LETTER <br /> (TO BE SIGNED,IF APPLICABLE,ONLY UPON SUBSTANTIAL COMPELTION OF PROJECT) <br /> State Agency Option Letter Number <br /> Department of Natural Resources <br /> Colorado Water Conservation Board(CWCB) <br /> 1313 Sherman St,Room 718 <br /> Denver,CO 80203 <br /> Borrower Original Contract Number <br /> Lupton Bottom Ditch Company CT:2018-2829 <br /> 11016 County Road 23 CMS:107362 <br /> Fort Lupton,CO 80621 <br /> Current Contract Maximum Amount Option Contract Number <br /> Current Contract Expiration Date <br /> 1. OPTIONS: <br /> A. Option to decrease total contract amount and revise contract expiration date. <br /> 2. REQUIRED PROVISIONS: <br /> A. The amount of the current Loan Contract Amount is decreased by($amount of change)from$ <br /> to$ in consideration of substantial completion of the Project.The Total Loan Amount is <br /> hereby modified accordingly. <br /> B. This change does not include a change to the annual payment and interest rate. <br /> C. This Option Letter and supporting documentation shall become part of and be incorporated into this <br /> Contract for the total duration of the Loan Contract. <br /> D. This Option Letter shall include the written Notice of Project Substantial Completion. <br /> E. The Contract Maximum Amount table on the Contract's Signature and Cover Page is hereby deleted and <br /> replaced with the Current Contract Maximum Amount table shown above. <br /> 3. OPTION EFFECTIVE DATE: <br /> A. The effective date of this Option Letter is upon approval of the State Controller or(Date),whichever is <br /> later. <br /> In accordance with§24-30-202 C.R.S.,this Option is not valid <br /> STATE OF COLORADO until signed and dated below by the State Controller or an <br /> John W.Hickenlooper,Governor authorized delegate. <br /> Department of Natural Resources STATE CONTROLLER <br /> Colorado Water Conservation Board Robert Jaros,CPA,MBA,JD <br /> By: <br /> By: <br /> Title: <br /> Title: <br /> Date: <br /> Option Effective Date: <br /> Page 1 of 1 <br /> Contract Number:CT2018-2829 <br />
The URL can be used to link to this page
Your browser does not support the video tag.