My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2018-1999 Contract
CWCB
>
Loan Projects
>
DayForward
>
6001-7000
>
CT2018-1999 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2018 1:06:01 PM
Creation date
1/10/2018 1:05:48 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2018-1999
Contractor Name
Centenial Irrigating Ditch Company
Contract Type
Loan
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The Loan Effective Date is the date on which this Contract is approved and signed by the <br /> Colorado State Controller or Designee, as shown on the signature and cover page of this <br /> Contract. The State shall not have any obligation under this Contract prior to the Loan <br /> Effective Date <br /> B. Loan Expiration Date <br /> The Loan Expiration Date is the date on which this Contract expires. The Loan Expiration <br /> Date is when the term of the loan, set from the Effective Date, ends, or upon the date of <br /> CWCB's Notice of Project Substantial Completion of Project, whichever is sooner. <br /> C. Project Term <br /> The Parties' respective performances of the project under this Contract shall commence on <br /> the Contract Project Performance Beginning Date shown on the Signature and Cover Page <br /> for this Contract and shall terminate on the Contract Project Performance End Date shown <br /> on the Signature and Cover Page for this Contract unless sooner terminated or further <br /> extended in accordance with the terms of this Contract. This project term does not include <br /> the full repayment period for the loan or this Contract. <br /> D. Project Extension Terms - State's Option <br /> The State, at its discretion, shall have the option to extend the Project performance under <br /> this Contract beyond the Project End Date for a period, at the same rates and under the <br /> same terms specified in the Contract (each such period a "Project Extension Term"). In <br /> order to exercise this option, the Borrower shall provide written justification to CWCB and <br /> CWCB will provide written authorization for the Project term extension. <br /> 3. AUTHORITY <br /> Authority to enter into this Contract exists in §37-60-119 (2), C.R.S., §37-60-120, C.R.S., §7-60- <br /> 121, C.R.S., and §37-60-121, C.R.S. <br /> 4. PURPOSE <br /> At the September 20, 2017 board meeting, CWCB approved a loan request for to improve the <br /> existing Centenial Ditch diversion structure on the Rio Grande River. This is one of five ditches <br /> of the Rio Grande diversion and headgate improvement projects being done by the Colorado <br /> River Grande Restoration Foundation. <br /> 5. DEFINITIONS <br /> The following terms shall be construed and interpreted as follows: <br /> A. "Appendices"means the following appendices attached to this contract: <br /> i. Appendix 1, Project Summary <br /> ii. Appendix 2, Option Letter <br /> iii. Appendix 3, Promissory Note <br /> iv. Appendix 4,Resolutions <br /> v. Appendix 5, Security Agreement <br /> vi. Appendix 6,Deed of Trust <br /> B. "Base Loan Amount" means the amount disbursed to the Borrower, which does not <br /> include the one percent(1%) loan origination fee. <br /> Page 3 of 19 <br /> Contract Number:CT2018-1999 <br />
The URL can be used to link to this page
Your browser does not support the video tag.