Laserfiche WebLink
construction, the BORROWER shall employ an inspector who has been approved by the <br /> CWCB staff. <br /> i. The BORROWER shall construct the PROJECT in accordance with the approved plans and <br /> specifications. <br /> j. Upon completion of the PROJECT construction, the BORROWER shall provide as-built <br /> drawings of the PROJECT to the CWCB staff, or, if required by § 37-87-105, C.R.S., the <br /> BORROWER shall provide the as-built drawings to the State Engineer's Office for approval <br /> and filing. <br /> k. Upon completion of the PROJECT construction, the BORROWER shall arrange a final <br /> inspection for the CWCB staff. <br /> I. The BORROWER shall pay all of the expenses related to the PROJECT when such bills are <br /> due. <br /> 2. Eligible Expenses. Listed below are the project expenses for which the Borrower is eligible <br /> for reimbursement: <br /> a. Preparing final designs and specifications for the PROJECT. <br /> b. Preparing bid and construction contract documents. <br /> c. Preparing environmental assessment or environmental impact statements, and otherwise <br /> complying with the Federal National Environmental Policy Act. <br /> d. Complying with all federal, state, and local regulatory requirements, including the obtaining <br /> of all required permits. <br /> e. Fish and wildlife mitigation measures required by federal, state, or local laws and <br /> regulations. <br /> f. Actual construction as called for in the design documents and in change orders approved <br /> by the STATE, the BORROWER, the CONSULTANT and the CONSTRUCTION FIRM. <br /> g. Engineering services for construction management, including design and construction <br /> management for STATE-approved change orders. <br /> h. Legal services for reviewing engineering services contracts, reviewing this contract, <br /> reviewing construction contract documents, and for complying with all federal, state, and <br /> local regulatory requirements. <br /> 3. Loan Disbursements. The BORROWER shall provide to the CWCB a report prior to each loan <br /> disbursement that states the PROJECT tasks completed and the costs expended for that <br /> period. The CWCB shall disburse loan funds in accordance with Section 4,.`(D_isbursement <br /> Schedule) of the Project Summary. , <br /> 4. Time for Performance. The BORROWER recognizes that' time is of the essence in the <br /> performance of all of its obligations under this contract. Therefore, the BORROWER shall <br /> complete the PROJECT within the time specified in Section 5 (Time For Performance) of the <br /> Project Summary. <br /> 5. Indemnification By The Construction Firm. The BORROWER shall require all Construction <br /> Firms and their subcontractors to indemnify the STATE and the BORROWER against all liability <br /> and loss, and against all claims and actions based upon or arising out of damage or injury, <br /> including death, to persons or property, caused by any acts or omissions of those parties or <br /> sustained in connection with the performance of any contract related to the PROJECT or by <br /> Page 6 of 11 <br />