Laserfiche WebLink
May 18, 2013 <br /> Page 2 <br /> d. Environmental Site Assessments <br /> We have prepared this cost estimate based on the outline included in the CWCD Water Project Loan <br /> Program Guidelines located at www.cwcb.state.co.us. <br /> The following scope of work and budgetary estimates for various engineering tasks is anticipated at <br /> this time. The figures provided below include all of TZA's estimated costs for conducting the <br /> engineering work associated with each of the below defined tasks as well as TZA'completing the <br /> preparation of the Loan Feasibility Report: <br /> 1.0 Introduction—N/A <br /> 2.0 Loan Feasibility Study Outline <br /> 2.1.1 Background/Purpose ... ... ... ... ... ... ... ............ ... ... ..............................$500 <br /> 2.1.2 Study Area Description ... ... ... ... ... ... ... ... ... ... ... ... ... ...... ... ... ... .....$2,500 <br /> 2.1.3 Previous Studies ... ... ... ...... ... ... ... ...... ... ... ... ... ... ... ...... ... ... ... .....$1,000 <br /> 2.2 Project Sponsor—N/A <br /> 2.3 Water Rights <br /> 2.3.1 Water Availability ... ... ... ... ...... ... ... ...... ... ... ...................................... <br /> $25,000 <br /> 2.3.2 Water Supply Demands ... ... ... ... ... ... ... ... ...... ...... .............................$5,000 <br /> 2.4 Project Description — Analysis of Alternatives & Selected <br /> Alternative <br /> 2.4.1 Analysis of Alternatives ... ... ... ... ... ... ... ... ... ... ... .................................. $750 <br /> 2.4.1 a Outputs/Yields ..........................................................................................$3,000 <br /> 2.4.1b Costs... ... ...... ... ... ... ... ... ...... ... ............................................................$3,500 <br /> 2.4.1c Impacts... ...... ... ... ... ... ... ... ... ... ... ............................................................$2,000 <br /> 2.4.1 d Economic analysis and feasibility <br /> ... ... ............................................................$3,500 <br /> 2.4.1e Institutional requirements <br /> ..................................................................................$2,000 <br /> 2.4.1f Special Considerations ..................................................................................$3,500 <br />