Laserfiche WebLink
Contract Details Page 2 of 4 <br /> Is this a Waived Contract? No <br /> Waiver Number <br /> Number of State Jobs Created 0 <br /> Duration of State Jobs Created 0 <br /> Rehabilitate and divert the El Codo <br /> Contract Purpose Ditch on the San Antonio River <br /> restoring optimal diversion <br /> effectiveness. <br /> Performance Period Start Date _ <br /> Performance Period End Date 12/31/2010 _ <br /> Conditions For Renewals) if renewals <br /> allowed — <br /> Number of renewal periods _ <br /> Solicitation Method Used * Grant Specific <br /> If OTHER, enter the Solicitation Method <br /> Was this an Emergency Sole Source? No <br /> Is there a Sole Source Justification on file? <br /> Was the Sole Source solicited on the BIDS <br /> system? <br /> Enter the Approval Document Number for <br /> the Sole Source — <br /> Were Performance Measures and <br /> Standards included in the Contract as part Yes _. <br /> of the Scope of Work? * <br /> Does the Contract contain methods to <br /> resolve noncompliance or Below Standard Yes <br /> performance ratings? * <br /> Is the Contractor/Vendor performing work <br /> previously performed by State Employee No <br /> (s)? * <br /> Are Services ANTICIPATED to occur No <br /> outside of Colorado? * — <br /> Are Services ANTICIPATED to occur No <br /> outside of the United States? * — <br /> How many positions (FTE) is the <br /> Contractor/Vendor filling that were 0 <br /> previously performed by State — <br /> Employees? * <br /> Actual Amount Paid Under the Contract <br /> Percentage of work ACTUALLY performed 0 <br /> outside of Colorado. — <br /> Percentage of work ACTUALLY performed <br /> https://sems.state.co.us/ContractDetails.aspx?ID=1281 7/8/2009 <br />