My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rio Grande - El Codo Ditch Diversion Rehabilitation_PO, NTP, SOW
CWCB
>
WSRF Grant & Loan Information
>
DayForward
>
METRO - SOUTH PLATTE
>
Rio Grande - El Codo Ditch Diversion Rehabilitation_PO, NTP, SOW
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2020 3:01:17 AM
Creation date
11/10/2017 12:31:54 PM
Metadata
Fields
Template:
WSRA Grant and Loan Information
Basin Roundtable
Rio Grande
Applicant
El Codo Ditch Company
Description
El Codo Ditch Diversion Rehabilitation
Account Source
Basin
Board Meeting Date
5/20/2009
Contract/PO #
OEPDA10-01
WSRA - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
June 4,2009 <br /> TASK 5—Demobilization (one day) <br /> Description of Task—Evacuate equipment and materials from project site. <br /> Method/Procedure-Exit gracefully leaving site and removing all traces of equipment and <br /> activity. <br /> Deliverable—Job complete. <br /> Deliverables for all phases of this Project-Restore the ability of the channel,over time,in the <br /> present climate,to be able to transport flow and detritus in such a manner as to maintain <br /> dimensions,pattern,slope,and profile without aggrading or degrading,while maintaining scour <br /> and sediment transport. <br /> • Ensure compliance with Compact obligations <br /> • Meet agricultural needs for irrigation more effectively <br /> • More adequately support the priority system <br /> • Significantly reduce maintenance demands of diversion structures; <br /> • Create a channel that will hold expected and experienced floodwaters of the San Antonio <br /> • Maintain the stable width/depth ratio of the channel; <br /> • Maintain the shear stress to move the largest size particles to maintain stability; <br /> • Decrease near-bank velocity; <br /> • Ensure stability of structures during major floods; <br /> • Maintain fish passage at all flows; <br /> • Improve fish habitat and riparian areas habitat <br /> • Create a channel that is visually compatible with natural surrounding; <br /> • Reduce erosion and prevent sediment deposition;and <br /> • Greatly reduce the risk of flood. <br /> i <br /> REPORTING AND FINAL DELIVERABLE <br /> Reporting: The applicant shall provide the CWCB a progress report every 6 months,beginning <br /> from the date of the executed contract. The progress report shall describe the completion or <br /> partial completion of the tasks identified in the scope of work including a description of any <br /> major issues that have occurred and any corrective action taken to address these issues. <br /> Final Deliverable: At completion of the project,the applicant shall provide the CWCB a final <br /> report that summarizes the project and documents how the project was completed. This report <br /> may contain photographs,summaries of meetings and engineering reports/designs. <br /> El Codo Ditch Company 7 Updated Statement of Work <br />
The URL can be used to link to this page
Your browser does not support the video tag.