My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2018-1960 Loan Contract
CWCB
>
Loan Projects
>
DayForward
>
6001-7000
>
CT2018-1960 Loan Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2017 10:33:29 AM
Creation date
11/8/2017 10:33:15 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2018-1960
Contractor Name
Fort Lyon Canal Company
Contract Type
Grant/Loan Combo
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
STATE OF COLORADO LOAN CONTRACT <br /> SIGNATURE AND COVER PAGE <br /> THREE(3)SIGNATURE PAGES(COVER PAGE),WITH ORIGINAL SIGNATURES,ARE REQUIRED <br /> State Agency(PDAA) Contract Number <br /> Colorado Water Conservation Board(CWCB) CT:2018-1960 <br /> 1313 Sherman St,Room 718 CMS: 104874 <br /> Denver,CO 80203 _ <br /> Borrower and Address Loan Contract Project Performance Beginning Date: <br /> The Fort Lyon Canal Company Effective Dale of Contract <br /> 750 Bent Ave Loan Contract Project Performance End Date: <br /> Las Animas,Colorado 81054 3 years from Effective Date or upon the date of CWC6's Notice of <br /> Entity Tyne Project Substantial Completion of the Project. <br /> Non-Intergovernmental-Colorado nonprofit corporation <br /> Base Loan Amount(Amount in CORE) Loan Contract Terms <br /> $8,100,000.00 1.50%for 40 years <br /> Loan I%Origination Fee Project Name <br /> $81,000.00 Adobe Creek dam Rehabilitation <br /> Total Loan Amount Loan Contract Purpose <br /> $8,181,000.00 To restore 32,560 acre-feet of storage at Adobe Creek Reservoir <br /> and lift the Dam Safety Branch of the Office of the State Engineer's <br /> storage restriction. <br /> THE PARTIES HERETO HAVE EXECUTED THIS CONTRACT <br /> Each person signing this Contract represents and warrants that he or she is duly authorized to execute this Contract and to bind the Party <br /> authorizing his or her signature. <br /> BORROWER STATE OF COLORADO <br /> The Fort Lyon Canal Company John W.Hickenlooper,Governor <br /> Colorado Department ofNatural Resources <br /> Colum Wat onse• tion Board(CWCB) <br /> Atb <br /> (Sign+' re) <br /> (Signal re) <br /> Name: Phil Hemphill <br /> Name: Kirk Russell,P.E.,Section Chief <br /> Title: President CWCB inance ection <br /> Date: ID/Z3/ ' <br /> Date: October 11 , 2017 <br /> ATTESof <br /> (S gnature) <br /> Name: Dale Mauch <br /> Title:__ Secretary <br /> Date: October 11 , 2017 <br /> In accordance with§24-30-202 C.R.S.,this Contract is not valid until signed and dated below by the State Controller or an authorized <br /> delegate. <br /> STATE CONTROLLER <br /> Robert Jaros,CPA,MBA,JD <br /> By: c� <br /> By:Susan t3orup,Controller,Depa. ment of Natu [Resources <br /> Effective Date: 112/3-1//1 <br /> Page 1of19 <br /> Contract Number:Cf2018-1960 <br />
The URL can be used to link to this page
Your browser does not support the video tag.