My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150062 Paid in Full Documents
CWCB
>
Loan Projects
>
DayForward
>
6001-7000
>
C150062 Paid in Full Documents
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2017 11:07:56 AM
Creation date
10/5/2017 11:07:37 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150062
Contractor Name
Town of Monument
Contract Type
Loan
Loan Projects - Doc Type
Repayment Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BORROWER: TOWN OF MONUMENT, COLORADO Agency Name: Water Conservation Board <br /> Contract No. C150062 Agency Number PDA <br /> Original Loan Amount : $2,081,000 Routing Number: 03 PDAaOO / 2 <br /> Adjustment (Increase): $ 362,000 <br /> Adjusted Loan Amount: $2,443,000 <br /> LOAN CONTRACT AMENDMENT No. 1 <br /> This Amendment, made this September 1, 2002, by and between the State of <br /> Colorado for the use and benefit of the Department of Natural Resources, Colorado Water <br /> Conservation Board ("CWCB" or "State"), and the Town of Monument, Colorado, acting by <br /> and through the Town of Monument, Colorado, Water Enterprise, P. O. Box 325, 166 2nd <br /> Street, Monument, CO 80132 ("BORROWER" or"Contractor"). <br /> FACTUAL RECITALS <br /> A. Authority exists in the law, and funds have been budgeted, appropriated, and otherwise <br /> made available for payment in Contract Encumbrance Number C150062. <br /> B. Required approval, clearance, and coordination have been accomplished from and with <br /> appropriate agencies. <br /> C. The CWCB and the Borrower entered into Contract Encum r Number C150062, <br /> dated March 1, 2002, hereinafter referred toNA' " i porated herein <br /> by reference, wherein the CWCB agreed a mi\ • y h t ount up to <br /> $2,081,000, and the Borrower agreed to repay the loan in accordance with the terms of <br /> the ORIGINAL CONTRACT. <br /> D. During construction of the PROJECT, the BORROWER encountered unforeseen site <br /> conditions, design modifications, and a need for additional work due to changes not <br /> anticipated in the original project cost estimate. These items increased the cost of the <br /> Project by $1,243,135. To meet the increased costs, the Borrower requested an <br /> additional $362,000, for a total loan amount of $2,443,000, <br /> E. Senate Bill 01-157, Section 2(2) provides that the CWCB may increase authorized <br /> loan amounts as may be justified by "reasons of ordinary fluctuations in construction <br /> costs as indicated by the engineering cost indices applicable to the types of <br /> Page 1 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.