My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2018-1335 Contract
CWCB
>
Loan Projects
>
DayForward
>
6001-7000
>
CT2018-1335 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2017 11:05:58 AM
Creation date
9/27/2017 11:05:46 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2018-1335
Contractor Name
Church Ditch Water Authority
Contract Type
Loan
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CHURCH DITCH WATER AUTHORITY <br /> RESOLUTION NO. 01 -2017 <br /> A RESOLUTION APPROVING A LOAN CONTRACT WITH THE <br /> COLORADO WATER CONSERVATION BOARD TO FINANCE DITCH <br /> REHABILITATION IN THE AMOUNT OF S3.62 MILLION <br /> WHEREAS, the Authority applied and received approval from the Colorado Water <br /> Conservancy Board for a loan in the amount of approximately$3.62 million for a thirty(30)year <br /> term at a fixed interest rate of 3.0% (the "CWCB Loan") to finance needed improvements and <br /> repairs the Authority plans to complete by Spring of 2019; <br /> WHEREAS, use of the CWCB Loan is regulated by a loan contract with the Colorado <br /> Water Conservancy Board,which loan contract requires Authority approval; and <br /> WHEREAS,at the duly noticed regular meeting of the Authority held on August 14,2017, <br /> at the Authority's administrative offices, 14025 W. 82"d Avenue, Arvada, Colorado, 80005, the <br /> Authority considered the CWCB loan contract,CWCB Loan Contract No.CT2018-1335 for Ditch <br /> System Improvements,provided by the State of Colorado that memorializes the CWCB Loan and <br /> all associated repayment obligations (the "Loan Contract"). <br /> BE IT RESOLVED BY THE CHURCH DITCH WATER AUTHORITY,THAT: <br /> Section 1. The Authority hereby approves the Loan Contract in substantially the form <br /> attached hereto as Exhibit 1 in a total loan amount not to exceed$3,615,000.00 and authorizes the <br /> Board President to execute the Loan Contract as well as any other required or associated <br /> documents. <br /> Section 2. The Authority hereby confirms it will perform and observe all of the terms, <br /> conditions' and obligations of CWCB Loan Contract No. CT2018-1335 for Ditch System <br /> Improvements and will pledge the collateral needed to assure repayment of the CWCB Loan. <br /> DATED this 14th day of August,2017. <br /> Tamara Moon,President <br /> ATTEST: <br /> Na an cCoy, eneral Manager <br /> APPENDIX 4 <br /> 08/03/17 <br /> O:I USERSICDIRES120171APPROVING CWCB CONTRACT-R080117.DOCX <br />
The URL can be used to link to this page
Your browser does not support the video tag.