My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2018-1335 Contract
CWCB
>
Loan Projects
>
DayForward
>
6001-7000
>
CT2018-1335 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2017 11:05:58 AM
Creation date
9/27/2017 11:05:46 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2018-1335
Contractor Name
Church Ditch Water Authority
Contract Type
Loan
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SECTION 5-SCHEDULE OF EXISTING DEBT <br /> As of the date of the CWCB loan approval, the BORROWER has an existing loan with <br /> the Colorado Water Conservation Board, Contract No. cT2o15-o14, with a current <br /> balance of$230,951.00, with annual payments of$12,378.00. The loan has an estimated <br /> maturity date of 2043 and is in good standing. <br /> SECTION 6-LOAN SECURITY <br /> The SECURITY for this loan, as evidenced by the executed SECURITY AGREEMENT <br /> (Appendix 5) and incorporated herein, shall be: (i) an irrevocable (but not <br /> exclusive) pledge to the CWCB of the PLEDGED REVENUES in such amount as is <br /> necessary to make each annual payment due under this LOAN CONTRACT, (ii) an <br /> assessment covenant; (iii) annual financial reporting, and an undivided one hundred <br /> percent (100%) interest in the Ford Street Siphon as more particularly described in <br /> the attached DEED OF TRUST (Appendix 6), incorporated herein. All LOAN SECURITY <br /> shall be in accordance with CWCB Policy No. 5. <br /> SECTION 7-ADDITIONAL CONDITIONS AND REQUIREMENTS <br /> None. <br /> SECTION 8-"CONSTRUCTION FUND PROGRAM"PROCEDURES FOR PROJECTS <br /> A. The BORROWER shall employ an engineer, registered in the State of Colorado to <br /> prepare plans and specifications for the PROJECT. <br /> B. Engineering contracts and the plans and specifications must be submitted to the <br /> CWCB staff for verification of compliance with the terms of this CONTRACT when <br /> available prior to bidding. Any modifications, to the plans and specifications that <br /> effect changes to the construction costs must be approved in writing by CWCB. <br /> C. For plans and specifications for all jurisdictional dams and reservoirs,as defined by <br /> §37-87-105 C.R.S., the BORROWER shall provide a letter of approval from the State <br /> Engineer's Office prior to construction. <br /> D. The BORROWER shall notify CWCB of the bid opening date, time and location. CWCB <br /> staff may elect to attend the bid opening. <br /> E. The BORROWER shall contract for the construction of the work with responsible and <br /> capable Construction Firms, selected by the BORROWER and found acceptable by the <br /> CWCB staff. CWCB must approve the award of the construction contract. <br /> F. The BORROWER must provide a copy of the following construction contract <br /> documents: executed contractor's proposal, executed construction contract, executed <br /> performance bond, executed payment bond, executed notice of award, proposed <br /> notice to proceed, sample change order, and sample field order, as well as the <br /> advertisement for bid. After the CWCB staff verifies that these documents comply <br /> Appendix <br /> Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.