Laserfiche WebLink
economical manner. <br /> 13. BORROWER'S Liability Insurance. <br /> a. Upon execution of this contract and continuing until complete repayment of the loan <br /> is made to the CWCB, the BORROWER shall maintain commercial general liability <br /> insurance, with a company that is satisfactory to the CWCB, with minimum limits of <br /> $1,000,000 combined single limit for each occurrence and $2,000,000 general <br /> aggregate, including products/completed operations and personal injury. <br /> b. Prior to the disbursement of any loan funds, the BORROWER shall provide the CWCB <br /> with an Acord Form 27 evidencing said insurance and shall provide the CWCB with <br /> documentation of renewals of said insurance. <br /> 14. Additional Contract Requirements. Any additional contract requirements are set <br /> forth in Additional Contract Requirement (Section 7) of the Project Summary. <br /> B. PROJECT PROVISIONS <br /> 1. Construction Fund Program Procedures. During the completion of the PROJECT, the <br /> BORROWER shall adhere to the CWCB Construction Fund Program Procedures <br /> (Section 8), of the Project Summary. <br /> 2. Eligible Expenses. The PROJECT expenses for which the BORROWER is eligible for <br /> loan disbursements are listed in Eligible Expenses (Section 9) of the Project <br /> Summary. <br /> 3. Loan Disbursements. The CWCB shall disburse loan funds in accordance with the <br /> Disbursement Schedule (Section 10) of the Project Summary. <br /> 4. Time for Performance. The BORROWER reco•niz-s t �t ;' is of the essence in the <br /> performance of all of its obligations under this, • dtri;-,. t ' rz. the BORROWER shall <br /> complete the PROJECT within the time specifierin ` .ir' ormance (Section 11) of <br /> the Project Summary. <br /> 5. Indemnification By The Construct's ,' ;FBok,, o ,shall require all <br /> Construction Firms and their subcon • •G t i • i e CWCB and the <br /> BORROWER against all liability and loss, .. • .gains all claims and actions based upon <br /> or arising out of damage or injury, including death, to persons or property, caused by <br /> any acts or omissions of those parties or sustained in connection with the performance <br /> of any contract related to the PROJECT or by conditions created thereby, or based upon <br /> any violation of any statute, ordinance, or regulation, and the defense of any such <br /> claims or actions. <br /> 6. Liability Insurance During Construction. During construction of the PROJECT, the <br /> BORROWER shall require the construction firm(s) and any subcontractors to maintain the <br /> following insurance coverage in the limits shown during the term of their contracts for <br /> the construction of the PROJECT. The BORROWER shall provide the CWCB with an Acord <br /> Form 27 evidencing said insurance prior to commencement of construction, maintained <br /> until construction is complete, and shall provide the CWCB with documentation of <br /> renewals of said insurance. No payments shall be made to the BORROWER unless all <br /> insurance certificates are current. <br /> a. Builder's risk insurance for construction in progress for all perils of loss including fire, <br /> Page 5 of9 <br />