Laserfiche WebLink
Mr. Ruben Hergert, President 2 <br /> Woods lake Mutual Water and <br /> Irrigation Company <br /> December 26, 1996 <br /> d. A contract must be completed before funds can be advanced on Your loan. You will <br /> be working with Jan Illian during the contracting process, which usually takes 3 to <br /> 6 months to complete. Jan will assist you with sample stockholder resolutions, and <br /> other documents necessary as part of the contracting process. <br /> e. You must adhere to the CWCB Design and Construction Administration Procedures. <br /> Mike Serlet will work with you on the CWCB requirements concerning design and <br /> bidding of the construction project. During the construction process he will make <br /> field inspections, which will be the basis of the monthly pay estimates for <br /> disbursements of your loan funds. <br /> On behalf of the Board, I would like to thank you for applying for a Construction Fund Loan <br /> from the Colorado Water Conservation Board. <br /> Sincerely, <br /> William P. Stanton, P.E. <br /> Chief, Project Planning and Construction Section <br /> Colorado Water Conservation Board <br /> JVSJvs <br /> Attachment: <br /> Updated Memo 12k.nov <br /> cc(w/Attachment): <br /> Ms.David L.Harrison,Board Member CWCB <br /> Mr.Duane H.Smith, P.E., 1225 Red Cedar Circle,Suite H,Ft.Collins CO 80524 <br /> cc(w/o Attachments): <br /> CWCB Section B Staff <br /> Linda Bassi,AGO <br /> C:\WPS I VOHN\I 2kNov96.ltr <br />