My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
011712 Field Purchase Order
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
011712 Field Purchase Order
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2020 3:51:10 PM
Creation date
9/15/2017 10:09:18 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
011712
Contractor Name
Greeley and Loveland Irrigation Company
Contract Type
Miscellaneous
Loan Projects - Doc Type
Default Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Plan of Study-Greeley and Loveland Irrigation System Rehabilitation Feasibility Study Page 2 <br /> DETAILED WORK TASKS <br /> The following POS is based on eight major activities. Each will result in the preparation of one or more <br /> deliverables which will be submitted for review and approval in accordance with the attached schedule. The task <br /> descriptions are arranged in the order of their performance with the exception of Task 8 Coordination Meetings. <br /> It is anticipated that project meetings will be held once a month. A summary of the deliverables for the Greeley <br /> and Loveland Irrigation System Rehabilitation Feasibility Study are shown in the following table: <br /> Task No. Description Product <br /> 1 Data Collection Memorandum, <br /> Existing Facilities Inventory <br /> 2 Hydrologic Analysis Memorandum <br /> 3 Existing Facilities Evaluation Memorandum, <br /> DSS Hydraulic Model <br /> 4 Alternative Development Memorandum <br /> 5 Alternative Evaluation Memorandum <br /> 6 Financial Analysis Memorandum <br /> 7 Study Report Report <br /> 8 Coordination Meetings Progress Reports <br /> Task 1 -Data Collection <br /> Objective: <br /> A thorough knowledge of previous studies will be augmented with published physical information,environmental <br /> and water rights issues. The published physical information will include construction drawings of the existing <br /> facilities(e.g.reservoirs,canals,turnouts,etc.). An understanding of the environmental and water rights issues <br /> will be developed by researching available information. <br /> Methodology: <br /> 1. A two-day field investigation will be made to develop an understanding of the project layout and <br /> operations. Photographs will be taken during the field survey to add in the development of the exiting <br /> facilities inventory. <br /> 2. An existing facilities inventory will be prepared. The inventory will describe the physical location, <br /> condition and hydraulic properties of the structures. <br /> 3. Available water rights information from the Company will be reviewed and tabulated. <br /> 4. Existing two-foot contour maps will be obtained from the City of Loveland. Survey spot checks will be <br /> identified during the field investigation associated with flow structures. <br /> F:\PROJECTS\GREELE-1\CWCB\GRELOV.PRO <br />
The URL can be used to link to this page
Your browser does not support the video tag.