My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150360 Amend 1
CWCB
>
Loan Projects
>
DayForward
>
5001-6000
>
C150360 Amend 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2017 11:14:21 AM
Creation date
8/30/2017 11:13:49 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150360 CT2015-141
Contractor Name
East Mesa Water Company
Contract Type
Loan
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
15. Operation of PROJECT. The BORROWER shall, without expense or legal liability to the <br />CWCB, manage, operate, and maintain the PROJECT continuously in an efficient and <br />economical manner. <br />16. BORROWER's Liability Insurance. <br />a. Upon execution of this CONTRACT and continuing until complete repayment of the <br />loan is made to the CWCB, the BORROWER shall maintain commercial general <br />liability insurance, with a company that is satisfactory to the CWCB, with minimum <br />limits of $1,000,000 combined single limit for each occurrence and $2,000,000 <br />general aggregate, including products/completed operations and personal injury. <br />b. Prior to the disbursement of any loan funds, the BORROWER shall provide the CWCB <br />with an Acord Form 25 evidencing said insurance and shall provide the CWCB with <br />documentation of renewals of said insurance. <br />17. Additional Contract Requirements. Any additional contract requirements are set <br />forth in Additional Conditions & Contract Requirements (Section 7) of the PROJECT <br />SUMMARY. <br />B. PROJECT PROVISIONS <br />1. Construction Fund Program Procedures. During the completion of the PROJECT, the <br />BORROWER shall adhere to the CWCB Construction Fund Program Procedures <br />(Section 8), of the PROJECT SUMMARY. <br />2. Eligible Expenses. The PROJECT expenses for which the BORROWER is eligible for <br />loan disbursements are listed in Eligible Expenses (Section 9) of the PROJECT <br />SUMMARY. <br />3. Loan Disbursements. The CWCB shall disburse loan funds in accordance with the <br />Disbursement Schedule (Section 10) of the PROJECT SUMMARY. <br />4. Time for Performance. The BORROWER recognizes that time is of the essence in the <br />performance of all of its obligations under this CONTRACT. Therefore, the BORROWER <br />shall complete the PROJECT within the time specified in Time for Performance (Section <br />11) of the PROJECT SUMMARY. <br />5. Indemnification by the Construction Firm. The BORROWER shall require all <br />construction firms and their subcontractors to indemnify the STATE and the BORROWER <br />against all liability and loss, and against all claims and actions based upon or arising <br />out of damage or injury, including death, to persons or property, caused by any acts or <br />omissions of those parties or sustained in connection with the performance of any <br />contract related to the PROJECT or by conditions created thereby, or based upon any <br />violation of any statute, ordinance, or regulation, and the defense of any such claims or <br />actions. <br />6. Liability Insurance during Construction. During construction of the PROJECT, the <br />BORROWER shall require the construction firm(s) and any subcontractors to maintain the <br />Loan Contract C150360 <br />Page 6 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.