My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2015-060 Contract Amendment NO. 2
CWCB
>
Loan Projects
>
DayForward
>
6001-7000
>
CT2015-060 Contract Amendment NO. 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2020 1:04:52 AM
Creation date
8/29/2017 1:28:50 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-060
C150337
Contractor Name
Well Augmentation Subdistrict Central Colorado WCD Amend 2
Contract Type
Loan
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Randy provided the Board a report on the Chatfield Storage Reallocation Project. The general <br /> manager of the group will now be sending out a newsletter electronically,contact Randy Ray if <br /> anyone is interested in having their email added to the list. <br /> An FAQ sheet was included in the packet. published by the Greenway Foundation. <br /> The CRMC had a Board meeting this morning. The mitigation company how has an office at <br /> Chatfield Reservoir through a lease agreement with Colorado Parks and Wildlife. Central has <br /> spent about$1.7 million of funds to date and the Mitigation Company has spent about $9 <br /> million. There will be a meeting about the marina to discuss design,ownership,etc. <br /> Secretary's Iteaort <br /> The Gilcrest high ground water pilot project is entering into year two of the pilot project. The <br /> water supply for year two of the pilot project will hopefully come from the City of Greeley. The <br /> Groundwater Committee is going to continue looking at having local irrigators pump additional <br /> groundwater and reducing surface diversions. Data will continue to be collected in the effort. <br /> The Board reviewed a map of a potential pipeline the town of Gilcrest may build to discharge <br /> storm water and high groundwater. One idea is to coordinate with Gilcrest and connect some of <br /> Central's augmentation wells to the Gilcrest pipeline. <br /> Christi Bode has interviewed Randy Ray and Randy Knutson and will be interviewing Tom Cech <br /> to begin creating Central's video library. <br /> Randy spoke on upcoming water demands and needs for dairies. feedlots.and industrial uses. <br /> These industries have been using very large amounts ofC-BT and distributed by area rural <br /> domestic suppliers. Central could be a solution to assist with the growing water needs. <br /> Staff was directed to pursue discussion with CWCB regarding their space they have available at <br /> Chatfield. <br /> Randy spoke to the Board regarding a lease he is working on with Great Western for this coming <br /> fall and winter. All income would be dedicated towards the Walker Recharge Project. <br /> Randy and Steve Bruntz gave an update on the Kiowa Creek flood damage to the Kiowa <br /> recharge project. A third party called a dam inspector and the repairs to the spillways and over- <br /> flow tubes are underway. <br /> The Board reviewed the March NOAA Forecast, Northern Colorado has equal changes for <br /> moisture in 2017. <br /> Staff reminded the Board of the GMS and WAS Member Meeting,to be held on March 23,2017 <br /> from 10am to 1 pm at Island Grove in the 4-11 building. <br /> 6 <br /> fi; <br />
The URL can be used to link to this page
Your browser does not support the video tag.