Laserfiche WebLink
available prior to bidding. Any modifications, to the plans and specifications that <br /> effect changes to the construction costs must be approved in writing by CWCB. <br /> C. For plans and specifications for all jurisdictional dams and reservoirs, as defined by § <br /> 37-87-105 C.R.S., the BORROWER shall provide a letter of approval from the State <br /> Engineer's Office prior to construction. <br /> D. CWCB must approve the award of the construction contract. <br /> E. The BORROWER shall contract for the construction of the work with responsible and <br /> capable Construction Firms, selected by the BORROWER and found acceptable by the <br /> CWCB staff. <br /> F. The BORROWER must provide a copy of the following construction contract <br /> documents: executed contractor's proposal, executed construction contract, executed <br /> performance bond, executed payment bond, executed notice of award, proposed <br /> notice to proceed, sample change order, and sample field order, as well as the <br /> advertisement for bid. After the CWCB staff verifies that these documents comply <br /> with the terms of this CONTRACT, the BORROWER may issue the notice to proceed to <br /> the Construction Firms. <br /> G. The BORROWER shall conduct a pre-construction conference at which time the CWCB <br /> staff shall have the opportunity to review and approve the construction schedule. <br /> H. If the CWCB staff determines that the PROJECT requires a resident inspector during <br /> construction, the BORROWER shall employ an inspector who has been approved by the <br /> CWCB staff. <br /> 1. The BORROWER shall construct the PROJECT in accordance with the approved plans and <br /> specifications. <br /> J. Upon completion of the PROJECT construction, the BORROWER shall provide as-built <br /> drawings of the PROJECT to the CWCB staff, or, if required by § 37-87-105, C.R.S., the <br /> BORROWER shall provide the as-built drawings to the State Engineer's Office for <br /> approval and filing. <br /> K. Upon completion of the PROJECT construction, the BORROWER shall arrange a final <br /> inspection for the CWCB staff. <br /> L. The BORROWER shall pay all of the expenses related to the PROJECT when such bills are <br /> due. <br /> SECTION 9-ELIGIBLE EXPENSES. <br /> The following items are eligible for loan disbursements: <br /> A. Preparing final designs and specifications for the PROJECT. <br /> Appendix i <br /> Page 3 of 4 <br />