My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2018-833 Contract
CWCB
>
Loan Projects
>
DayForward
>
6001-7000
>
CT2018-833 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2020 1:05:46 AM
Creation date
8/29/2017 1:28:39 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2018-833
Contractor Name
Southeastern Colorado Water Conservancy District
Contract Type
Loan
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PROJECT SUMMARY - SOUTHEASTERN COLORADO WATER CONSERVANCY <br /> DISTRICT,ACTING BY AND THROUGH ITS WATER ACTIVITY ENTERPRISE <br /> LOAN CONTRACT No. CT2oi8-833 <br /> SECTION 1-BORROWER INFORMATION <br /> Name: Southeastern Colorado Water Conservancy District, acting by <br /> and through its Water Activity Enterprise <br /> Type of Entity: A government-owned business within the meaning of Article <br /> X, Section 20(2)(d) of the Colorado Constitution, organized as <br /> a water conservancy district pursuant to Section 37-45-1oi, et. <br /> seq. and operated as an enterprise pursuant to C.R.S. §37-45.1- <br /> ioi et seq., and owned by the Southeastern Colorado Water <br /> Conservancy District <br /> Address: 31717 United Avenue, Pueblo, CO, 81ool <br /> Contact: Kevin Meador, P.E. <br /> Phone Number: 720-252-4205 <br /> E-mail address: Kevin@secwcd.com <br /> SECTION 2-PROJECT DESCRIPTION <br /> A. Description of PROJECT: The BORROWER applied to the CWCB for a loan to be used <br /> for the Arkansas Valley Conduit Phase One, Pueblo Dam Hydroelectric Project <br /> (PROJECT), located in Pueblo County to help the Lower Arkansas River Basin <br /> communities provide a safe and reliable water supply to replace their dependence on <br /> contaminated groundwater. Phase One of the AVC project is the development of <br /> hydropower on Pueblo Dam.The total estimated Project Cost is$19,o6o,000.00 <br /> B. Description of Feasibility Study: The CWCB has reviewed a feasibility study report, <br /> on the PROJECT, dated June 1, 2oi6, titled "Pueblo Dam Hydroelectric Project Loan <br /> Feasibility Study,"which was prepared by Kevin Meador, P.E., of the Southeastern <br /> Colorado Water Conservancy District. Other studies used in the preparation of the <br /> Feasibility Study include the "Hydropower Feasibility Update, Pueblo Dam <br /> Hydroelectric Project," dated March 21, 2014 by CH2M, the "Draft Design <br /> Documentation Report Preliminary Design, Pueblo Dam Hydroelectric Project," <br /> dated June 2014 by CH2M, and the "Design Proposal, Pueblo Dam Hydroelectric <br /> Project," dated May 2, 2o16 by Mountain States Hydro, LLC. All are incorporated <br /> herein by this reference. Based upon the feasibility report, the CWCB determined the <br /> PROJECT to be technically and financially feasible. <br /> SECTION 3-CWCB'S AUTHORITY <br /> Severance Tax Perpetual Base Fund:This loan is made pursuant to the provisions of <br /> §§ 39-29-109(1)(a)(1), 37-6o-u9 and 37-6o-120, C.R.S.,which authorize the CWCB to <br /> Appendix i <br /> Page I of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.