My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2018-892 Contract
CWCB
>
Loan Projects
>
DayForward
>
6001-7000
>
CT2018-892 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2017 11:22:20 AM
Creation date
7/26/2017 11:22:06 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2018-892
Contractor Name
Town of Wiggins
Contract Type
Loan
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I. If the CWCB staff determines that the PROJECT requires a resident inspector during <br /> construction, the BORROWER shall employ an inspector who has been approved by the <br /> CWCB staff. <br /> J. The BORROWER shall construct the PROJECT in accordance with the approved plans and <br /> specifications. <br /> K. Upon completion of the PROJECT construction, the BORROWER shall provide as-built <br /> drawings of the PROJECT to the CWCB staff, or, if required by § 37-87-105, C.R.S., the <br /> BORROWER shall provide the as-built drawings to the State Engineer's Office for <br /> approval and filing. <br /> L. Upon completion of the PROJECT construction, the BORROWER shall arrange a final <br /> inspection for the CWCB staff. <br /> M. The BORROWER shall pay all of the expenses related to the PROJECT when such bills are <br /> due. <br /> SECTION 9-ELIGIBLE EXPENSES: THE FOLLOWING ITEMS ARE ELIGIBLE FOR LOAN DISBURSEMENTS <br /> ELIGIBLE EXPENSES FOR WATER RIGHTS PURCHASE <br /> A. Engineering associated with the feasibility report prepared as a requirement for this <br /> loan and associated with evaluating the suitability of the water rights for purchase by <br /> the BORROWER. <br /> B. Interest during completion of the PROJECT pursuant to Paragraph B.5 herein. <br /> C. Legal services for reviewing engineering services contracts and this CONTRACT. <br /> D. Purchase of the water rights. <br /> ELIGIBLE EXPENSES FOR PROJECT <br /> A. Preparing final designs and specifications for the PROJECT. <br /> B. Preparing bid and construction contract documents. <br /> C. Preparing environmental assessment or environmental impact statements, and <br /> otherwise complying with the Federal National Environmental Policy Act. <br /> D. Complying with all federal, state, and local regulatory requirements, including the <br /> obtaining of all required permits. <br /> E. Fish and wildlife mitigation measures required by federal, state, or local laws and <br /> regulations. <br /> F. Actual construction as called for in the design documents and in change orders <br /> approved by the CWCB and the BORROWER. <br /> G. Engineering services for construction management, including design and <br /> construction management for CWCB approved change orders. <br /> Appendix 1 <br /> Page 4of6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.