My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2015-061 Time for Performance Extention Agreement
CWCB
>
Loan Projects
>
DayForward
>
6001-7000
>
CT2015-061 Time for Performance Extention Agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2017 9:49:13 AM
Creation date
6/29/2017 9:49:12 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-061
Contract Type
Loan
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
GRAND MESA WATER CONSERVANCY DISTRICT <br /> P.O. Box 129 <br /> Cedaredge, Colorado 81413 <br /> May 15, 2017 <br /> Anna Mauss, P.E. <br /> Colorado Water Conservation Board <br /> 1313 Sherman St #718 <br /> Denver, CO 80203 <br /> RE: Request for additional time for Loan Contract CT2015-061 <br /> Peak Reservoir and Blanche Park Reservoir Rehabilitation Project <br /> Dear Ms. Mauss, <br /> The Grand Mesa Water Conservancy District is requesting additional time for <br /> performance for loan contract CT2015-061. The loan is for construction on Peak <br /> Reservoir and Blanche Park Reservoir. Work at Peak Reservoir is complete but the <br /> construction at Blanche Park Reservoir was delayed due to permitting issues. Please see <br /> attached "Blanche Park Reservoir—Tasks and Timeline," for an updated schedule. The <br /> District anticipates construction will be complete by November 1, 2017; however, final <br /> engineering reports will take additional time. Please extend the loan contract to November <br /> 1, 2018. <br /> Sincerely, <br /> Austin M. Keiser, President <br />
The URL can be used to link to this page
Your browser does not support the video tag.