My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2015-061 Ammendment No. 1
CWCB
>
Loan Projects
>
DayForward
>
6001-7000
>
CT2015-061 Ammendment No. 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2017 9:49:12 AM
Creation date
6/29/2017 9:49:07 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-061
Contractor Name
Grand Mesa Water Conservancy District
Contract Type
Loan
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
APPENDIX A,AMENDMENT No.i TO LOAN CONTRACT CT2015-061 <br /> AMENDMENT TO PROMISSORY NOTE <br /> Date: June 4, 2017 <br /> Borrower: Grand Mesa Water Conservancy District, acting by and <br /> through the water activity enterprise <br /> Total Loan Amount: $303,000.00 <br /> Interest Rate: 1.55%per annum <br /> Term of Repayment: 20 years or until loan is paid in full <br /> Loan Contract No.: CT2o15-o61 <br /> Loan Payment: $17,735.57 <br /> Payment Initiation Date*: <br /> (To be filled in at Substantial Completion of Project) <br /> Maturity Date*: <br /> (To be filled in at Substantial Completion of Project) <br /> *Payment Initiation Date and Maturity Date fields are filled in after the project has been substantially completed. <br /> FOR VALUE RECEIVED, the BORROWER promises to pay the Colorado Water Conservation <br /> Board ("CWCB"), the Principal Amount plus Interest for the Term of Repayment, pursuant <br /> to the LOAN CONTRACT and this promissory note. <br /> 1. This Amendment to Promissory Note replaces and supersedes the Promissory Note <br /> attached to the original contract dated July 9, 2013, in the amount of$227,250.00. <br /> 2. Principal and interest shall be payable in equal Loan Payments, with the first payment <br /> due and payable one year from Payment Initiation Date, and annually thereafter. All <br /> principal, interest, and late charges, if any, then remaining unpaid shall be due and <br /> payable on or before the Maturity Date. <br /> 3. Payments shall be made to the Colorado Water Conservation Board at 1313 Sherman <br /> Street, Room 718, Denver, Colorado 80203. <br /> 4. The CWCB may impose a late charge in the amount of 5% of the annual payment if the <br /> CWCB does not receive the annual payment within 15 calendar days of the due date. <br /> 5. This Note may be prepaid in whole or in part at any time without premium or penalty. <br /> Any partial prepayment shall not postpone the due date of any subsequent payments or <br /> change the amount of such payments. <br /> 6. All payments received shall be applied first to late charges, if any, next to accrued <br /> Appendix A <br /> Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.