My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2017-2875 Contract
CWCB
>
Loan Projects
>
DayForward
>
6001-7000
>
CT2017-2875 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2017 8:26:00 AM
Creation date
6/26/2017 8:25:48 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2017-2875
Contractor Name
Grand Valley Water Users Association
Contract Type
Loan
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BORROWER: GRAND VALLEY WATER USERS AGENCY NAME: COLORADO WATER <br /> ASSOCIATION CONSERVATION BOARD <br /> BASE LOAN AMOUNT:$1,700,000.00 CONTRACT TYPE:LOAN/PRIVATE <br /> LOAN ORIGINATION FEE:$17,000.00 CWCB CMS:9558o/CORE:CT2017-2875 <br /> TOTAL LOAN AMOUNT:$1,717,000.00 <br /> LOAN CONTRACT <br /> This contract ("CONTRACT" or "LOAN CONTRACT") is made between the State of <br /> Colorado for the use and benefit of The Department of Natural Resources, Colorado Water <br /> Conservation Board, 1313 Sherman Street, Denver, CO, 80203, ("CWCB" or "State"), and <br /> Grand Valley Water Users Association, 1147 24 Road, Grand Junction, Colorado 81505, a <br /> nonprofit corporation ("BORROWER"). <br /> FACTUAL RECITALS <br /> 1. CWCB authority exists in the law, and funds have been budgeted, appropriated and <br /> otherwise made available and a sufficient unencumbered balance thereof remains <br /> available for encumbering and subsequent payment of this CONTRACT;and <br /> 2. Required approval, clearance, and coordination have been accomplished from and with <br /> appropriate agencies;and <br /> 3. On September 21, 2016, the CWCB approved a loan request from the BORROWER for the <br /> Grand Valley Power Plant Rehabilitation ("PROJECT").The goal of this PROJECT is to bring <br /> GRAND VALLEY POWER PLANT (GVPP) up to a sustainable operating condition and meet <br /> current electric and safety standards. The total estimated Project Cost is $5,200,000.00. <br /> The total loan amount ("TOTAL LOAN AMOUNT") of $1,717,000.00 which includes a one <br /> percent (1%) loan origination fee of$17,000.00 is payable over 3o years at an interest rate <br /> of 2.0%;and <br /> 4. The PROJECT SUMMARY, attached as APPENDIX 1, and incorporated herein contains <br /> BORROWER Information (Section 1), the PROJECT Description (Section 2), CWCB's <br /> authority for making this loan (Section 3), and CWCB Approval or Legislative <br /> Authorization (Section 4), identifying the amount of the loan and the terms of <br /> repayment. The PROJECT SUMMARY also contains sections on the BORROWER'S existing <br /> debt, contract requirements, procedures, eligible expenses, disbursement schedule and <br /> time for performance. <br /> 5. The CWCB now desires, by this CONTRACT, to loan money to the BORROWER for this <br /> PROJECT upon mutually agreeable terms and conditions. <br /> THEREFORE, in consideration of the mutual and dependent covenants contained <br /> herein,the parties agree as follows: <br /> A. DEFINITIONS <br /> The following terms as used herein shall be construed and interpreted as follows: <br /> Page i of i4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.