My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150317 Request for Extension
CWCB
>
Loan Projects
>
DayForward
>
6001-7000
>
C150317 Request for Extension
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2021 2:23:34 PM
Creation date
6/13/2017 3:30:09 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150317
CT2015-013
Contractor Name
Lake Durango Water Authority
Contract Type
Loan
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Lake Durango Water Authority <br /> PO Box 657 <br /> Durango, CO 81302 <br /> May 24, 2017 <br /> Peg Mason <br /> Colorado Water Conservation Board <br /> Contracts Manager, Water Project Loan Section <br /> 1313 Sherman St., Room 721 <br /> Denver, CO 80203 <br /> Re: Loan Contract C150317 Request for Extension. <br /> Dear Ms. Mason, <br /> Please consider this request to extend CWCB Loan Contract C150317 until January 31, 2019. To <br /> date$200,500.24 of loan funds and $41,066.31 of grant funds have been utilized for the <br /> purchase of Animas La Plata Project water and to provide the infrastructure to deliver raw water <br /> from Lake Nighthorse to Lake Durango Reservoir. <br /> There are several factors which have contributed to delays in completion of the project. <br /> Preliminary project design was not completed until October 2015 due to design considerations <br /> required by project partners La Plata West Water Authority,Southern Ute and Ute Mountain Ute <br /> Indian Tribes. Responses to the initial bid requests were substantially above the project budget <br /> requiring project redesign which was completed in May 2016.The contract for pipeline <br /> construction was awarded to Canyon Construction in August 2016 however construction could <br /> not begin until September when the Licensing Agreement with the Bureau of Reclamation (BOR) <br /> was finalized.There were additional delays due to disparities between survey and prescriptive <br /> easement locations.The ground did not freeze due to the wet and warm winter of 2016/2017 <br /> further delaying construction progress and nesting bald eagles near the pipeline route put a <br /> portion of the project on hold this spring. Finally the BOR required a second section 106 <br /> consultation with related Indian Tribes before approving a blasting plan for rock removal along <br /> the pipeline route. <br /> To date the project has been designed and Environmental Assessment completed.The road to <br /> Lake Nighthorse has been completed to grade, over 1000'of 30" pipe have installed, the bore and <br /> installation of 16" pipe under County Road 210 has been completed, and a portion of 8" pipe has <br /> been installed at Lake Durango. Additionally 50 acre-feet depletion of ALP Project water was <br /> purchased from the Animas La Plata Water Conservancy District. <br />
The URL can be used to link to this page
Your browser does not support the video tag.