My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2015-012 Feasibility Study Increase
CWCB
>
Loan Projects
>
DayForward
>
6001-7000
>
CT2015-012 Feasibility Study Increase
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2017 2:41:46 PM
Creation date
6/13/2017 2:41:45 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-012
Contractor Name
Sanchez Ditch and Reservoir Company
Contract Type
Loan
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br /> Sanchez Ditch & Reservoir Company <br /> RR 1 Box 215 <br /> San Acacio, Colorado 81151 <br /> 719 672 3963 <br /> April 14,2017 <br /> Anna Mauss,P.E. <br /> Colorado Water Conservation Board <br /> 1313 Sherman St.#718 <br /> Denver,Colorado 80203 <br /> Re: Request for additional funding on Loan Contract CT2015-012 <br /> Dear Ms. Mauss, <br /> Sanchez Ditch and Reservoir Company is requesting additional funding on loan contract CT2015-2012 in the amount of <br /> $120,000.00. This request will cover the interest payment that is due in 2017 and the remaining will be used as follows: <br /> To install monitoring equipment,review the monitoring equipment weekly during the runoff and produce a report in the <br /> Fall 2017. Listed below is the detailed breakdown of the estimated cost from AECOM. <br /> Monitoring Equipment Installation($24,000) <br /> • AECOM's time for Installing the equipment Is included in the existing contract We likely will not have remaining <br /> budget once this task is complete <br /> • $24,000 for a contractor to install the chase lines and utility boxes <br /> Data Review($8,000) <br /> • Weekly review of data(check hydraulic gradients/seepage flowrates/turbidity).May through July(12 <br /> weeks/$500/wk) <br /> • Sanchez Reservoir Company to purchase a turbidity meter for periodic sampling of seepage($1,500). Report <br /> and Recommendations($26,000) <br /> • Summary report in Fall 2017(24hrs John,40hrs Doug,60hrs Craig)?? <br /> o Summarize data/review <br /> o Make recommendations for path forward(future investigations/monitoring,raise/lower reservoir,etc.) <br /> o Evaluate critical hydraulic gradients <br /> Meetings with the SE0($6,000) <br /> • Assume 3 meetings <br /> Project Management($2,000) <br /> • Invoicing <br /> Contingency($13,000) <br /> • 15%of the known costs at this time($87,000) <br /> Estimated Total$100,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.