My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2015-061 Loan Increase
CWCB
>
Loan Projects
>
DayForward
>
6001-7000
>
CT2015-061 Loan Increase
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2017 10:38:09 AM
Creation date
6/6/2017 10:35:16 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-061
C150354
Contractor Name
Grand Mesa Water Conservancy District
Contract Type
Loan
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
•� COLORADO <br />� Colarado Water <br />.. Conservation Board <br />Department of Natural Resources <br />1313 Sherman Street, Raam 718 <br />Denver, CO 80203 <br />May 30, 2017 <br />Austin Keiser, President <br />Grand Mesa Water Conservancy District <br />P.O. Box 129 <br />Cedaredge, CO 81413 <br />Re: Peak Reservoir and Blanthe Park Reservoir Rehabilitation Project • Laan Increase <br />Contract No. CT2015-061 (C150354) <br />Mr. Keiser: <br />1 am pleased to inform you that on May 18, 2017, the Colorado Water Conservation Board approved a loan <br />increase for the Peak Reservoir and Bianche Park Reservoir Rehabilitation Project of $75,750.00 <br />($75,000.00 for Project costs and 5750.00 for the 1% service fee) to the Grarxi Mesa Water Conservancy <br />District, acting by and through its water activity enterprise, for costs related to the Peak Reservoir and <br />Blanche Park Reservoir Rehabilitation Project. The totat loan amount wilt become $303,000.00 <br />($300,000.00 for Project costs and S3,OOO.QO for the 196 service fee). The toan terms shall remain 20 <br />years at 1.55% per annum. Security for the toan shall remain a pledge of water activity enterprise <br />revenues backed by a rate covenant. <br />I have attached a copy of the updated Board memo dated May 19, 20i7 that includes the Board's <br />approval. <br />As you are aware, an amended contract must be in place befo�e the additional funds can be disbursed. Peg <br />Mason, Loan Cantracts Manager, wilt initiate the loan amendment process. You are welcome to contact <br />Peg at {303) 866-3441 x3227 regarding the status of the amendment. <br />On behalf of the Board, I would like to thank you for your inie�est in a CWCB toan fo� this valuabte <br />proj ect. <br />Sincerety, <br />� <br />Kirk Russell, P.E., Chief <br />Finance 5ection <br />Attachment: Updated Board Memo <br />P 303.86G.3441 F 303.866.44i4 www.cwcb.sta[e.co.us <br />John W. Hitkentooper, Governor � Robert Randall, DNR Executive Director I Lauren Ris, CWCB Acting Director <br />
The URL can be used to link to this page
Your browser does not support the video tag.