My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2015-012 Loan Increase
CWCB
>
Loan Projects
>
DayForward
>
6001-7000
>
CT2015-012 Loan Increase
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2017 10:37:50 AM
Creation date
6/6/2017 10:35:12 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-012
C150342
Contractor Name
Sanchez Ditch and Reservoir Company
Contract Type
Loan
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
�� <br />4 <br />��c o� o a A � o Sanchez Reservoir Outtet Rehabi litation Project <br />Colorado Water <br />Conscrvadon 8oard Sanchez Ditch and Reservoir Company <br />May 2017 Board Meeting <br />Project �ost: <br />CWCB Loan (with Service Fee): <br />LoQn Term andlnterest Rate: <br />fundina Source: <br />•icu(ture MuniripQl <br />10096 096 Low - 0� Mfd - 0% Hi <br />(2"a Loan Increase} <br />� <br />S2,4d2,00Q ', �J-�� -.i <br />$1,502,476 5 <br />40 Years @ 2.096 A._� <br />Commerciof ! <br />0% � <br />Dam Rehabilitation <br />15, OOOAF <br />_ / '� <br />The Sanchez Ditch and Reservoir Company provides � � <br />irrigation water for users in Costilla County, southwest of County: Costilla <br />the town of San Luis. Its primary storage reservoir is WQter Source: Vente�o Creek <br />Sanchez Reservoir. The approximately 104,000 acre-foot Droinage Basin: Rio Grande <br />reservoir was built in 1910. 7he resei-voir's outlet p��sion: 3 District: 24 <br />originally incEuded a 135 foot tall concrete gate tower. -- <br />To operate the dam, a tramway/gondola ran along a <br />cable and was powered by a portabte gasoline generator. Because daily access to the tower was <br />required during irrigation season, the reliability and safety of the gondola system had been a concern <br />of the Company. Using loan and grant funds, the Company replaced the outlet tower with new cont�ol <br />gates and operators; patched the outlet conduit; repaired the downstream outlet structure. It is in the <br />process of addressing seepage monitoring concerns. The seepage monitoring (both installation of <br />equipment and engineering to review and analyze the data) is more expensive than the Company <br />originally budgeted. Therefore, the Company is requesting a 5120,000 loan increase. With this increase <br />the total CWCB funding into the projett will be 51,502,47b in loan funds and S914,400 in Water Supply <br />Reserve Fund Grant funds. <br />; <br />_ � ;, �,�., � <br />...w... .. _. ..� . 1,,..�.� �s.... .. . <br />Water Project �oan Program - Project Data Sheet <br />
The URL can be used to link to this page
Your browser does not support the video tag.