My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2017-2878 Contract
CWCB
>
Loan Projects
>
Backfile
>
3001-3102
>
CT2017-2878 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2020 1:05:39 AM
Creation date
4/28/2017 2:02:00 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2017-2878
Contractor Name
Orchard Mesa Irrigation
Contract Type
Loan
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SECTION 10-DISBURSEMENT SCHEDULE <br /> For project expenses: The BORROWER shall prepare a periodic progress report that sets <br /> forth a statement of the PROJECT costs expended for that period and shall forward said <br /> statement to the CWCB. After receipt of the periodic progress report from the <br /> BORROWER, and review and acceptance of the items therein as eligible expenses, as <br /> described above, the CWCB will pay to the BORROWER the amount set forth in the <br /> report or such portion as has been approved by the CWCB. Such payment shall be <br /> made within thirty (30)days from the CWCB's approval of each progress report. <br /> SECTION 11-TIME FOR PERFORMANCE <br /> PROTECT To BEGIN: Upon Effective Date of this CONTRACT (the date this CONTRACT is <br /> signed by the State Controller or his designee). <br /> PROTECT To END: Three (3)years from the Effective Date of this CONTRACT. <br /> [THE REST OF THIS PAGE INTENTIONALLY LEFT BLANK] <br /> I <br /> Appendix i <br /> Page 4 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.