My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Colorado - East Mesa Water-EastMesaDitch_Final Deliverable
CWCB
>
WSRF Grant & Loan Information
>
DayForward
>
ARK - GUNNISON
>
Colorado - East Mesa Water-EastMesaDitch_Final Deliverable
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2017 3:25:16 PM
Creation date
4/13/2017 8:49:55 AM
Metadata
Fields
Template:
WSRA Grant and Loan Information
Basin Roundtable
Colorado
Applicant
East Mesa Water Company
Description
Thomas Creek Crossing and Pipeline and Flume Replacement
Account Source
Basin
Board Meeting Date
7/20/2016
Contract/PO #
POGG1 2017-343
WSRA - Doc Type
Final Deliverable Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Sierra Excavating LLC Invoice <br /> P.O.Box 886 <br /> New Castle,CO 81647 Date Invoice# <br /> 1/17,2017 16-1577-De <br /> Bill To <br /> East Mesa Water Company <br /> 1625 County Road I I I <br /> Carbondale,CO 81623 <br /> P 0 No, Terms Project <br /> Wexner Driveway Wexner Driveway <br /> Qty Description Rate Amount <br /> 9.5 1600(GR)-Lay pipe-12/1/16 95.00 902.50 <br /> 95 Labor(AC)-Dig waterline-1211116 35.00 332.50 <br /> 9.5 1600(GR)-Dig waterline-1212/16 95.00 902.50 <br /> 9.5 75(SQ)-Waterline-1212116 105.00 997-50 <br /> 9.5 Labor(AC)-Dig waterline-1212/16 35.00 33150 <br /> 9.5 1600(GR)-Dig waterline-12/3/16 95.00 902.50 <br /> 9.5 75(SQ)-Dig waterline-12/3/16 105.00 997-50 <br /> 9.5 150(NR)-Waterline- 1213116 105.00 997.50 <br /> 95 Labor(AC)-Lay pipes-12/3/16 35.00 332.50 <br /> 9.5 Labor(ZR)-Lay pipes-12/3/16 35.00 332.50 <br /> 10 1600(GR)-Dig waterline-12/4/16 95.00 950.00 <br /> 10 75(SQ)-Work on waterline-12/4/16 105.00 1,050.00 <br /> 10.5 150(NR)-Waterline-12/4/16 105.00 1,102.50 <br /> 10.5 Labor(AC)-Lay pipes- 1214/16 35.00 367-50 <br /> 10.5 Labor(ZR)-Lay pipes-12/4/16 35.00 367,50 <br /> 10.5 Labor(AC)-Lay cement-1215/16 35.00 367.50 <br /> 10 Labor(AC)-Lay cement forms-1217116 35.00 350.00 <br /> Materials-RFVC 705.00 705.00 <br /> Total $12,290.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.