Laserfiche WebLink
Severance Tax Trust Fund Perpetual Base Account to the BORROWER in an amount up <br /> to $4,994,955 for PROJECT costs, not to exceed 90% of the cost of the PROJECT, with a <br /> loan origination fee of 1% in accordance with CWCB Policy No. 16, at an interest rate of <br /> 3.6% per annum for a repayment term of 20 years. <br /> SECTION 5—SCHEDULE OF EXISTING DEBT <br /> The BORROWER has four outstanding revenue bond issues (1) 1999 Water Revenue Bond, <br /> principal balance $4,100,000, maturing in 2019, with a payment of $381,523 due in 2006; <br /> (2) 2002 Water Revenue Bond, principal balance $3,145,000, maturing in 2021, with a <br /> payment of $208,645 due in 2006; (3) 2004 Water Revenue Refunding Bond, principal <br /> balance $4,635,000, maturing in 2014, with a payment of$258,658 due in 2006; (4) 2004B <br /> Water Revenue Refunding Bond, principal balance $5,085,000, maturing in 2020, with a <br /> payment of $230,213 due in 2006; and two loans with Colorado Water Resources and <br /> Power Development Authority that mature in 2008 (1) $4,800,000 September 15, 1992, <br /> and (2) $1,617,221 September 15, 1998. The parity certificate dated <br /> establishing that the lien created by this loan has parity with the liens described above, is <br /> incorporated herein by reference. <br /> SECTION 6— ADDITIONAL CONDITIONS &CONTRACT REQUIREMENTS <br /> No additional conditions. <br /> SECTION 7—CONSTRUCTION FUND PROGRAM PROCEDURES <br /> A. The BORROWER shall employ an engineer, registered in the state of Colorado to <br /> prepare plans and specifications for the PROJECT. <br /> B. The BORROWER's and the Engineering Consultant's plans and specifications must <br /> be submitted to the CWCB staff for verification of compliance with the terms of this <br /> Contract when available prior to bidding. Any modifications to the plans and <br /> specifications must be approved in vYritI g y e WCB staff. <br /> C. For plans and specifications for all 1 a: s and reservoirs, as defined <br /> by § 37-87-105 C.R.S., the BORRO e a letter of approval from the <br /> State Engineer's Office prior t s cVeg <br /> _ <br /> D. CWCB staff must be present I p - nup <br /> prove the award of the <br /> construction contract. <br /> E. The BORROWER shall contract for the construction of the work with responsible and <br /> capable Construction Firms, which said Construction Firms shall be selected by <br /> the BORROWER and found acceptable by the CWCB staff. <br /> F. The BORROWER must provide a copy of the executed construction contract <br /> documents consisting of the contractor's proposal, construction contract, <br /> performance bond, payment bond, notice of award, notice to proceed, sample <br /> change order, and sample field order, as well as the advertisement for bid and bid <br /> bond at bidding. After the CWCB staff verifies that these documents comply with <br /> Appendix 1 to Loan Contract C150210 <br /> Page 2 of 4 <br />