My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150121 Paid in Full Contract
CWCB
>
Loan Projects
>
DayForward
>
6001-7000
>
C150121 Paid in Full Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2017 3:25:16 PM
Creation date
4/12/2017 12:53:00 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150121
Contractor Name
Little Thompson Water District
Contract Type
Loan
Loan Projects - Doc Type
Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
9 0 <br /> drawings of the PROJECT to the CWCB staff, or, if required by § 37-87-105, C.R.S., the <br /> BORROWER shall provide the as-built drawings to the State Engineer's Office for <br /> approval and filing. <br /> K. Upon completion of the PROJECT construction, the BORROWER shall arrange a final <br /> inspection for the CWCB staff. <br /> L. The BORROWER shall pay all of the expenses related to the PROJECT when such bills <br /> are due. <br /> SECTION 8 — ELIGIBLE EXPENSES. The following items are eligible for loan disbursements. <br /> A. Preparing final designs and specifications for the PROJECT. <br /> B. Preparing bid and construction contract documents. <br /> C. Preparing environmental assessment or environmental impact statements, and <br /> otherwise complying with the Federal National Environmental Policy Act. <br /> D. Complying with all federal, state, and local regulatory requirements, including the <br /> obtaining of all required permits. <br /> E. Fish and wildlife mitigation measures required by federal, state, or local laws and <br /> regulations. <br /> F. Actual construction as called for in the design documents and in change orders <br /> approved by the CWCB and the BORROWER. <br /> G. Engineering services for construction management, in e construction <br /> management for CWCB-approved change orders. , <br /> H. Interest duringcompletion of the PROJECT pursuant to ragraph A.4 of the Contract. <br /> p <br /> I. Legal services for reviewing engineering servic t Ct 1 g his'`. ontract, <br /> reviewing construction contract documents, and r plyl Tll�, ec} 1,,Mate, <br /> and local regulatory requirements. " y <br /> SECTION 9 — DISBURSEMENT SCHEDULE <br /> For Project costs: The BORROWER shall prepare a periodic progress report which <br /> contains a statement of the PROJECT costs expended for that period and shall forward <br /> said statement to the CWCB. After receipt of the periodic progress report from the <br /> BORROWER, and review and acceptance of the items therein as eligible expenses as <br /> described below, the CWCB will pay to the BORROWER the amount set forth in the <br /> report or such portion that has been approved by the CWCB. Such payment shall be <br /> made within thirty (30) days from the CWCB's approval of each progress report. <br /> SECTION 10 —TIME FOR PERFORMANCE <br /> PROJECT Beginning: Upon Effective Date of this Contract (the date this contract is <br /> signed by the State Controller or his designee). <br /> PROJECT Finish: 2 years from the Effective Date of this Contract <br /> Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.