Laserfiche WebLink
9 0 <br /> drawings of the PROJECT to the CWCB staff, or, if required by § 37-87-105, C.R.S., the <br /> BORROWER shall provide the as-built drawings to the State Engineer's Office for <br /> approval and filing. <br /> K. Upon completion of the PROJECT construction, the BORROWER shall arrange a final <br /> inspection for the CWCB staff. <br /> L. The BORROWER shall pay all of the expenses related to the PROJECT when such bills <br /> are due. <br /> SECTION 8 — ELIGIBLE EXPENSES. The following items are eligible for loan disbursements. <br /> A. Preparing final designs and specifications for the PROJECT. <br /> B. Preparing bid and construction contract documents. <br /> C. Preparing environmental assessment or environmental impact statements, and <br /> otherwise complying with the Federal National Environmental Policy Act. <br /> D. Complying with all federal, state, and local regulatory requirements, including the <br /> obtaining of all required permits. <br /> E. Fish and wildlife mitigation measures required by federal, state, or local laws and <br /> regulations. <br /> F. Actual construction as called for in the design documents and in change orders <br /> approved by the CWCB and the BORROWER. <br /> G. Engineering services for construction management, in e construction <br /> management for CWCB-approved change orders. , <br /> H. Interest duringcompletion of the PROJECT pursuant to ragraph A.4 of the Contract. <br /> p <br /> I. Legal services for reviewing engineering servic t Ct 1 g his'`. ontract, <br /> reviewing construction contract documents, and r plyl Tll�, ec} 1,,Mate, <br /> and local regulatory requirements. " y <br /> SECTION 9 — DISBURSEMENT SCHEDULE <br /> For Project costs: The BORROWER shall prepare a periodic progress report which <br /> contains a statement of the PROJECT costs expended for that period and shall forward <br /> said statement to the CWCB. After receipt of the periodic progress report from the <br /> BORROWER, and review and acceptance of the items therein as eligible expenses as <br /> described below, the CWCB will pay to the BORROWER the amount set forth in the <br /> report or such portion that has been approved by the CWCB. Such payment shall be <br /> made within thirty (30) days from the CWCB's approval of each progress report. <br /> SECTION 10 —TIME FOR PERFORMANCE <br /> PROJECT Beginning: Upon Effective Date of this Contract (the date this contract is <br /> signed by the State Controller or his designee). <br /> PROJECT Finish: 2 years from the Effective Date of this Contract <br /> Page 3 of 3 <br />