My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2018-892 Feasibilty Study
CWCB
>
Loan Projects
>
DayForward
>
6001-7000
>
CT2018-892 Feasibilty Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2018 12:21:10 PM
Creation date
3/24/2017 2:49:42 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2018-892
Contractor Name
Town of Wiggins
Contract Type
Loan
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Results <br /> The URFs for the two example locations at the Glassey Parcel is presented in Tables 2 and 3.The URF is <br /> shown as the percent accreting per 30 day period (approximately 1 month) to demonstrate the <br /> approximate monthly accretion pattern and length of accretion. The URF for the North location was <br /> wrapped at 2,595 days (95 percent level).The URF for the South location was wrapped at 2751 days <br /> (95 percent level). <br /> Table 4 presents the number of days and months it takes to achieve,25,50, 75,and 100 percent of the j <br /> total wrapped accretion/depletion to the stream for the North and South example locations. <br /> References <br /> Glover,RE,and Balmer,G.G.,1954, River depletion resulting from pumping a well near a river, <br /> Transactions of the American Geophysical Union,v.35,no.3,p.468-470. <br /> CDM Smith,2013.South Platte Decision Support System Alluvial Groundwater Model Report. Prepared <br /> for the Colorado Water Conservation Board and Colorado Division of Water Resources. <br /> LeonardKicc <br /> L4_ {NGU4f FA !Ni <br />
The URL can be used to link to this page
Your browser does not support the video tag.