My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2015-039 Approval Letter
CWCB
>
Loan Projects
>
DayForward
>
6001-7000
>
CT2015-039 Approval Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2017 2:46:11 PM
Creation date
3/24/2017 12:32:08 PM
Metadata
Fields
Template:
Loan Projects
Contractor Name
Big Elk Meadows Association
Contract Type
Loan
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� <br /> COLORADO 1m]Sherman Street John *ickenlooper, Governor <br /> o��. 0�m <br /> Colorado Water Robert Randall, DNR Executive Director <br /> Conservation Board p (303)866-3441 <br /> � 0i o^pm�men�n,wmuro/ne�ou�e� | F(3O]}86�'447� � James rector <br /> TO: Colorado Water Conservation Board Members <br /> FROM: Jonathan Hernandez, P.E., Projectkxana <br /> Kirk Russell, P.E.' Finance Section Chief <br /> DATE: March 22'33, 2017 Board Meeting (Updated March 23, 2017) <br /> AGENDA }TEhA: 29a. Change to Existing Loans <br /> Big Elk Meadows Association Emergency Raw Water Storage Reconstruction <br /> Introduction <br /> The Big Elk Meadows Association (Association) received approval ofn $1,515'O0O[YV[Bloan, Contract <br /> number CT2015'039 ([15D301)' to finance the Emergency Raw Water Storage Reconstruction (Project) <br /> at the January 2014 Board Meeting. The purpose nfthe Project isto restore the water supply tothe Big <br /> Elk Meadows community by rebuilding its five raw water storage dams which were destroyed in the <br /> September 2013 flood event within the tributaries tnthe South Platte River. The original Project cost <br /> estimate was $1'900,000. Due LV an increase in construction cost' and a delay in receiving FEMA grant <br /> funds' the Association is requesting a loan increase of $500,000 to help with its cash flow during <br /> construction and through the FEMA grant reimbursement period. Sec the attached Project Data Sheet <br /> fora location map and a Project summary, and the original loan request Board Memo. <br /> Staff Recommendation (Board approved Staff Recommendation on March 23, 2017) <br /> Staff recommends the Board approve a loan increase of $505,000 ($500,000 for Project costs and <br /> $5`OOOfor the 1% service fee), fora total loan not toexceed $2,020,000 ($2,000,000 for Project costs <br /> and $20,000 for the 1% Loan Service Fee) to the Big Elk Meadows Association for costs related to the <br /> Emergency Raw Water Storage Reconstruction Project' from the Severance Tax Perpetual Bose Fund. <br /> The loan terms shalt be modified toGyears ofno interest' followed by 30-years at the interest rate of <br /> 2.75% per annum. Security for the loan shall be in compliance with [YYCB Financial Policy #5. <br /> Additionally staff recommends modifying the following existing contract condition: <br /> "Any future_grant funds obtained for the purpose of this Project shall be submitted to CWCB to be <br /> applied to the balance of the loan within thirty(30)calendar days after receipt of said funds. <br /> to read: <br /> .Except . any future grant funds obtained for the purpose ofthis Project shall bp <br /> submitted to[WC8 tobeapplied to the balance nfthe /cmn within thirty(30) co/endordmysoƒterrece/pt <br /> ofsaid funds. Non-rescinded FEMA grant fu <br /> Q0) calendar days af received FEMA__qiLant <br /> reDavment of rescinded grant funds, Project <br /> Interstate Compact Compliance -Watershed Protection - Flood Planning Et Mitigation Stream Et Lake Protection �a <br /> Water Project Loans EtGrants ^Water Modeling ^ Conservation 6Drought Pianniny ^ Water 5uppiPiannmg | <br />
The URL can be used to link to this page
Your browser does not support the video tag.